• Copper Conc. TC 25%min CIF Chinadown(-3)  07-04|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-04|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-50)  07-04|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-50)  07-04|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-100)  07-04|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(8)  07-04|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-04|Selenium Powder 99.9%min Delivered Indiaup(50)  07-04|Chrome Lump S.A. 38%min In port Chinadown(-1)  07-04|Silico-manganese 60/14 EXW Chinaup(100)  07-04|Silico-manganese 65/17 EXW Chinaup(100)  07-04|Rebar HRB400 20mm In warehouse Guangzhouup(50)  07-04|Flake Graphite +195 EXW Chinadown(-100)  07-04|Ferro-silicon 75%min In warehouse Rotterdamdown(-20)  07-04
  • AsianMetal
    Events & Holidays
    event
    • Company: 
    • Minkay Consultancy

    • Contact: 
    • Yildiray
    • Tel: 
    • +905333753216
    • Fax: 
    • +905333753216
    • Date :
    • 2010-10-29 15:45:12
    • Buy/Sell:
    • sell
    • Metal :
    • ORE WITH 35 % Pb AND 13 GR/TON Au
    • Specification:
    • ore with lead (Pb) 35 % and 13 gram per ton
    • Quantity:
    • 2000 metric ton / month
    • Price:
    • 600.00 USD/MT
    • Origin:
    • TURKEY
    • Packing:
    • BULK
    • Loading Port:
    • TEKIRDAG
    • Shipment Date:
    • AFTER 1 MONTH
    • Delivery:
    • EXWORK QUARRY
    • Payment:
    • 100 % CASH
    • Documents:
    • CHEMOCAL ANALYSIS REPORT
    • Inspection:
    • BY INTERNATIONAL INSPECTUON COMPANIES
    • Validity:
    • 1 MONTH
    • Remark:
    • LEAD - AU ORE
    • Attachment1:
    • Attachment2:
    Send an Inquiry:
      Copyright © Asian Metal Ltd All rights reserved.