• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • The analysis of high carbon ferrochrome capacity and output in Inner Monggolia 2013

    2014-03-31 20:54:32   【Print】
    The following is a brief synopsis of the report. Your access is restricted as it is a subscription based service.
    Please contact us for a subscription.
    In 2012 the production capacity of Chinese high carbon ferrochrome was 4 million tons.Asian Metal Copyright6 million tons.Asian Metal Copyright The additional production capacity in 2013 was 500-600 thousand tons, so in 2013 Chinese production capacity of high carbon ferrochrome reached 4.Asian Metal Copyright6 million tons.Asian Metal Copyright5-4.Asian Metal Copyright The additional production capacity in 2013 was 500-600 thousand tons, so in 2013 Chinese production capacity of high carbon ferrochrome reached 4.Asian Metal Copyright6 million tons.Asian Metal Copyright The additional production capacity in 2013 was 500-600 thousand tons, so in 2013 Chinese production capacity of high carbon ferrochrome reached 4.Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.