• Iron Ore Fine 65%min EXW Shandongdown(-28)  09-23|Ferro-nickel 10%min EXW Chinadown(-30)  09-23|Iron Ore Fine 65%min Ex-VAT EXW Shanxidown(-20)  09-23|Lithium Metal 99%min Delivered Chinadown(-25000)  09-23|Tungsten Ore WO3 55%min EXW Chinadown(-10000)  09-23|Iron Ore Fine Australian 62%min In port Chinadown(-20)  09-23|Lithium Metal 99.9%min Delivered Chinadown(-25000)  09-23|Iron Ore Fine 65%min EXW Liaoningdown(-20)  09-23|Cobalt Oxide 72%min Delivered Chinadown(-5)  09-23|Iron Ore Fine 66%min Ex-VAT EXW Hebeidown(-20)  09-23|Iron Ore Lump Australian 62%min In port Chinadown(-20)  09-23|Iron Ore Fine Brazilian 65%min In port Chinadown(-20)  09-23|Erbium Oxide 99.5%min IW Rotterdamup(3)  09-23|Vanadium Pentoxide Flake 98%min IW Rotterdamup(0.1)  09-23
  • AsianMetal
    Events & Holidays
    event
    • Company: 
    • Clarince Construction and Mining Zambia Ltd

    • Contact: 
    • Prince Chileshe
    • Tel: 
    • +260 979976543
    • Fax: 
    • Date :
    • 2012-03-30 21:45:54
    • Buy/Sell:
    • sell
    • Metal :
    • Tin Ore
    • Specification:
    • 70% and better
    • Quantity:
    • 25mt/month
    • Price:
    • negotiable.US $ per MT.
    • Origin:
    • ZAMBIA
    • Packing:
    • as required
    • Loading Port:
    • Dar Es Salaam, Tanzania.
    • Shipment Date:
    • within 5 days
    • Delivery:
    • F.O.B
    • Payment:
    • T/T OR L.C
    • Documents:
    • CONTRACT
    • Inspection:
    • ANALYSIS REPORT
    • Validity:
    • longterm
    • Remark:
    • The current market price of the commodities commercialized by SELLER would be provided in Full Corporate Offer (FCO) addressed to the interested party.
    • Attachment1:
    • Attachment2:
    Send an Inquiry:
      Copyright © Asian Metal Ltd All rights reserved.