• Cobalt Intermediate 30-40% CIF Chinadown(-0.5)  09-15|Ferro-vanadium 80%min IW Rotterdamup(0.7)  09-15|Coal Tar Pitch Coking Value 56%min EXW Chinaup(180)  09-15|Ilmenite Conc 52%min CIF Chinadown(-5)  09-15|Samarium Metal 99.5%min FOB Chinaup(0.5)  09-15|Tin Conc. Burmese 20%min IW MengAdown(-10000)  09-15|Tin Conc. Burmese 30%min IW MengAdown(-10000)  09-15|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max FOB Chinadown(-0.5)  09-15|Zinc Ingot 99.99%min EXW China down(-710)  09-15|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered South Koreadown(-0.5)  09-15|Lithium Carbonate 99.5%min FOB South Americadown(-0.5)  09-15|Tin Conc. 60%min Delivered Chinadown(-10000)  09-15|Lithium Carbonate 99.5%min Delivered EUdown(-0.5)  09-15|Cobalt Powder 99.5%min Delivered Chinadown(-10)  09-15
  • AsianMetal
    Events & Holidays
    event
    • Company: 
    • LLP MSK

    • Contact: 
    • Oleg
    • Tel: 
    • 7 7055761790
    • Fax: 
    • 7 null
    • Date :
    • 2026-09-14 18:54:05
    • Buy/Sell:
    • sell
    • Metal :
    • TI ZIR DEPOSIT (MINERAL RESERVE)
    • Specification:
    • TITANIUM-ZIRCON-RUTILE SANDS
    • Quantity:
    • Estimated reserves, m3 - 8440629 ore
    • Price:
    • INVESTMENT PROJECT
    • Origin:
    • Kazakhstan
    • Packing:
    • PROCESSING OF TITANIUM-ZIRCON SANDS TO OBTAIN ILMENITE, ZIRCON AND RUTILE-LEUCOXENE CONCENTRATES
    • Loading Port:
    • CREATION IN KAZAKHSTAN OF PRODUCTION FACILITIES FOR DEEP PROCESSING
    • Shipment Date:
    • Zircon, Ilmenite, Rutile concentrate
    • Delivery:
    • LICENSE FOR THE MINING OF SOLID MINERALS
    • Payment:
    • THE DEPOSIT IS PREPARED FOR STARTING
    • Documents:
    • NVESTMENT PROJECT
    • Inspection:
    • different
    • Validity:
    • different forms of cooperation
    • Remark:
    • minsevqazz@mail.ru
    • Attachment1:
    • Attachment2:
    Send an Inquiry:
      Copyright © Asian Metal Ltd All rights reserved.