• Tin Solder Bar 60%min EXW Chinadown(-7.5)  11-02|Ammonium Metavanadate 98%min EXW Chinadown(-2000)  11-02|Tin Solder Bar 40%min EXW Chinadown(-5)  11-02|Cobalt Powder 99.5%min Delivered Chinadown(-8)  11-02|Ferro-molybdenum 65%min IW USup(2)  11-02|Ytterbium Oxide 99.99%min EXW Chinaup(4)  11-02|Lanthanum Oxide 99.999%min EXW Chinadown(-1200)  11-02|Ferro-tungsten 75%min IW Rotterdamdown(-4)  11-02|Cobalt Metal 99.8%min IW Rotterdamdown(-0.5)  11-02|Prebaked Anode S 3%max EXW Chinaup(150)  11-02|Mercury Metal 99.9%min Ex-VAT EXW Chinadown(-50)  11-02|Nickel Ore Philippine 1.3%min CIF Chinadown(-1)  11-02|Mercury Metal 99.999%min Ex-VAT EXW Chinadown(-50)  11-02|Gallium Metal 99.99%min FOB Chinaup(10)  11-02
  • AsianMetal
    Events & Holidays
    event
    • Company: 
    • Clarince Construction and Mining Zambia Ltd

    • Contact: 
    • Prince Chileshe
    • Tel: 
    • +260 979976543
    • Fax: 
    • Date :
    • 2012-03-30 21:50:57
    • Buy/Sell:
    • sell
    • Metal :
    • LEAD ORE(GALENA)
    • Specification:
    • 70% and better
    • Quantity:
    • 1000 mt/month
    • Price:
    • negotiable.US $ per MT.
    • Origin:
    • ZAMBIA
    • Packing:
    • as required
    • Loading Port:
    • Dar Es Salaam, Tanzania.
    • Shipment Date:
    • within 5 days
    • Delivery:
    • F.O.B
    • Payment:
    • T/T OR L.C
    • Documents:
    • CONTRACT
    • Inspection:
    • ANALYSIS REPORT
    • Validity:
    • longterm
    • Remark:
    • The current market price of the commodities commercialized by SELLER would be provided in Full Corporate Offer (FCO) addressed to the interested party.
    • Attachment1:
    • Attachment2:
    Send an Inquiry:
      Copyright © Asian Metal Ltd All rights reserved.