• Zinc Conc. 50%min EXW North China TCdown(-500)  08-28|Zinc Conc. 50%min EXW South China TCdown(-500)  08-28|Lead Conc. Pb 50%min, Ag 3,000g/dt max EXW China TCdown(-300)  08-28|Manganese Ore 38%min FOB S.A. up(0.3)  08-28|Manganese Ore S.A. 37%min In Qinzhou Portup(1)  08-28|Strontium Metal 99%min EXW Chinaup(2500)  08-28|Manganese Ore S.A. 37%min In Tianjin Portup(1)  08-28|Manganese Ore Gabonese 44%min In Qinzhou Portup(1)  08-28|Germanium Dioxide 99.99%min EXW Chinaup(500)  08-28|Strontium Metal 99%min FOB Chinaup(350)  08-28|Manganese Ore S.A. 36%min In Qinzhou Portup(0.9)  08-28|Manganese Ore S.A. 36%min In Tianjin Portup(0.9)  08-28|Manganese Ore Australian 45%min In Qinzhou Portup(1)  08-28|Manganese Ore Brazilian 44%min In Qinzhou Portup(1)  08-28
  • AsianMetal
    Events & Holidays
    event
    • Company: 
    • Yuanda (tianjin) electromechanical equipment installation engineering co., LTD

    • Contact: 
    • Xueshun Tang
    • Tel: 
    • 86 13102051782
    • Fax: 
    • 86 13102051782
    • Date :
    • 2021-07-08 22:05:00
    • Buy/Sell:
    • buy
    • Metal :
    • Iron and steel
    • Specification:
    • The heavy waste
    • Quantity:
    • 10000
    • Price:
    • discuss
    • Origin:
    • There is no limit
    • Packing:
    • There is no limit
    • Loading Port:
    • There is no limit
    • Shipment Date:
    • 30 days.
    • Delivery:
    • Border crossings
    • Payment:
    • lc
    • Documents:
    • discuss
    • Inspection:
    • sgs
    • Validity:
    • discuss
    • Remark:
    • +8613102051782
    • Attachment1:
    • Attachment2:
    Send an Inquiry:
      Copyright © Asian Metal Ltd All rights reserved.