• Ferro-tungsten 75%min IW Rotterdamdown(-5)  10-30|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max FOB Chinadown(-0.4)  10-30|Tin Conc. Burmese 20%min IW MengAdown(-10000)  10-30|Tin Conc. Burmese 30%min IW MengAdown(-10000)  10-30|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered South Koreadown(-0.4)  10-30|Lanthanum Oxide 99.999%min EXW Chinadown(-1300)  10-30|Ytterbium Oxide 99.99%min EXW Chinaup(4)  10-30|Lithium Carbonate 99.5%min Delivered EUdown(-0.4)  10-30|Lithium Carbonate 99.5%min CIF Chinadown(-0.4)  10-30|Tin Conc. 60%min Delivered Chinadown(-10000)  10-30|Spodumene Li2O 5%min In port Chinadown(-50)  10-30|Tin Ingot 99.95%min EXW Chinadown(-10000)  10-30|Lithium Carbonate 99.5%min Delivered USdown(-0.4)  10-30|Flake Graphite +195 FOB Africaup(20)  10-30
  • AsianMetal
    Events & Holidays
    event
    • Company: 
    • Plenitude Capital Sdn Bhd

    • Contact: 
    • Zaff Dato Khairuddin
    • Tel: 
    • +60179939370
    • Fax: 
    • +6043512040
    • Date :
    • 2013-12-17 13:10:17
    • Buy/Sell:
    • sell
    • Metal :
    • Iron Ore Joint Venture Operations
    • Specification:
    • Investor: JV Operations of Iron Ore Mining in Sungai Siput, Perak, Malaysia We are the owner of the mining site seeking for JV partner with low investment and enable to commence works immediately as all the Mining Licenses from Malaysian's Authorities had obtained. We apply option either totally taking over or we can cooperate to run the mining. Round table discussion is widely open for the benefit of both parties and on "WIN-WIN" situation. Tested Methods: Energy Dispersive X-Ray (EDX) Fe(%) : 71.49% P(%) : 0.03% S(%) : 0.11% Mn(%) : NA% As(%) : 0.15% Si(%) : 0.18% O(%) : 28.07% Ca(%) : NA Mg(%) : NA Sio2(%): NA AI2O3(%): NA
    • Quantity:
    • >30,000 MT p/Month
    • Price:
    • Neg
    • Origin:
    • Malaysia
    • Packing:
    • Bulk Vessel
    • Loading Port:
    • Perai, Butterworth, Malaysia
    • Shipment Date:
    • 90 Days
    • Delivery:
    • FOB
    • Payment:
    • MT103, TT or Cash
    • Documents:
    • Mining License Obtained can commence immediately
    • Inspection:
    • Completed by Geologist: University of Petronas
    • Validity:
    • 2 weeks
    • Remark:
    • JV Operations as First Come, First Serves Basis
    • Attachment1:
    • Attachment2:
    Send an Inquiry:
      Copyright © Asian Metal Ltd All rights reserved.