• Copper Conc. TC 25%min CIF Chinadown(-3)  07-04|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-04|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-50)  07-04|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-50)  07-04|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-100)  07-04|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(8)  07-04|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-04|Selenium Powder 99.9%min Delivered Indiaup(50)  07-04|Chrome Lump S.A. 38%min In port Chinadown(-1)  07-04|Silico-manganese 60/14 EXW Chinaup(100)  07-04|Silico-manganese 65/17 EXW Chinaup(100)  07-04|Rebar HRB400 20mm In warehouse Guangzhouup(50)  07-04|Flake Graphite +195 EXW Chinadown(-100)  07-04|Ferro-silicon 75%min In warehouse Rotterdamdown(-20)  07-04
  • 
    AsianMetal
    Events & Holidays
    event
    
    Business Visits

    Axis Mineral visits Asian Metal

    On October 23, Axis Mineral Resources S.A. visited Asian Metal. Mr. Ramesh Sodum, Director of the Group, Mr. Nishant Thanki, Partner of the Group and its marketing agents, Mr. Alain Scheinin and Ms. Eileen Cheng introduced their bauxite project in Guinea. Meanwhile, they talked about current global bauxite market.
    Axis plans to launch the bauxite project in Guinea next October, with annual capacity of 5 million tonnes. They have independent road and port by themselves and the mine site is only around 40km away from the port.
    They will provide with bauxite Al 43-45% Si 2%max.
    Asian Metal
    From left: Friday Gao, Nishant, Romesh, Alain and Eileen
     
      Copyright © Asian Metal Ltd All rights reserved.