• Copper Conc. TC 25%min CIF China(-1)  06-12|Lithium Carbonate 99.5%min Delivered China(-3000)  06-12|Iron Ore Fine 66%min Ex-VAT EXW Handan(-30)  06-12|Lithium Manganate Mn 58% Delivered China(-1000)  06-12|Iron Ore Fine 65%min EXW Laiwu(-30)  06-12|Indium Ingot 99.995%min Delivered US(10)  06-12|YEu Oxide Eu2O3/REO 6.6%min EXW China(-1)  06-12|Indium Ingot 99.995%min Delivered Europe(10)  06-12|Tin Conc. Burmese 20%min In warehouse MengA(6000)  06-12|Tin Conc. Burmese 30%min In warehouse MengA(6000)  06-12|Terbium Oxide 99.99%min EXW China(-150)  06-12|Lithium Iron Phosphate Li 3.9%min Delivered China(-1000)  06-12|Spodumene Li2O 6%min CIF China(-30)  06-12|Terbium Oxide 99.99%min FOB China(-20)  06-12
  • BHP Billiton iron ore production update

    2011-07-22 09:16:12   [Print]
    BHP Billiton’s commitment to invest through all phases of the economic cycle delivered an eleventh consecutive annual production record in iron ore.

    Western Australia Iron Ore benefited from the dual tracking of the company’s rail infrastructure, increasing overall system capability.

    Western Australia Iron Ore shipments rose to a record annualized rate of 155 million tonnes per annum in the June 2011 quarter.

    Samarco (Brazil) production recovered strongly following planned maintenance in the March 2011 quarter.


    Jun '11 (YTD)

    Jun '11 (Q)

    Change (YTD)

    134,406

    35,526

    8%


    (In '000 tonne)

    .Asian Metal CopyrightBHP Billiton’s commitment to invest through all phases of the economic cycle delivered an eleventh consecutive annual production record in iron oreAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.