• Chromium Metal 99%min EXW Chinaup(3500)  10-14|Chromium Metal 99%min FOB Chinaup(500)  10-14|Tungsten Ore WO3 55%min EXW Chinadown(-10000)  10-14|Strontium Metal 99%min FOB Chinaup(600)  10-14|Cobalt Powder 99.5%min Delivered Chinadown(-10)  10-14|Spodumene Li2O 3%min In port Chinadown(-50)  10-14|Coal Tar Pitch Coking Value 56%min EXW Chinadown(-200)  10-14|Strontium Metal 99%min EXW Chinaup(4000)  10-14|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinadown(-3000)  10-14|Lithium Cobaltate Co 60%min Delivered Chinadown(-7)  10-14|NCM 613 Delivered Chinadown(-2000)  10-14|Ferro-tungsten 70%min EXW Chinadown(-15000)  10-14|LNCMO 613 PC Delivered Chinadown(-4)  10-14|Spodumene Li2O 6%min CIF Chinadown(-50)  10-14
  • Arafura expands US rare earth offtake deal by 70%

    2026-10-15 10:49:37   [Print]
    Arafura Rare Earths, backed by mining investor Gina Rinehart, has secured an agreement to supply Traxys North America with 850 tonnes of neodymium-praseodymium (NdPr) oxide per annum from its Nolans project, representing a 70% increase on the volumes set out in the original term sheet.

    The binding contract has a five-year term, with a two-year extension option subject to mutual consent. The initial May 2026 term sheet covered annual deliveries of 500 tonnes of NdPr oxide, alongside potential supply of 7.Asian Metal Copyright5 tonnes of dysprosium-terbium oxides.Asian Metal Copyright5 tonnes of dysprosium-terbium oxides.

    Situated roughly 135 km from Alice Springs, Nolans is being developed as Australia's first fully integrated ore-to-oxide rare earths operation, comprising a mine, processing and separation facilities and associated supporting infrastructure. Site construction kicked off this month, with first output targeted for mid?2029.Asian Metal Copyright Situated roughly 135 km from Alice Springs, Nolans is being developed as Australia's first fully integrated ore-to-oxide rare earths operation, comprising a mine, processing and separation facilities and associated supporting infrastructure.Asian Metal Copyright Arafura estimates the project could satisfy around 5% of global rare earth demand.

    .Asian Metal Copyright The initial May 2026 term sheet covered annual deliveries of 500 tonnes of NdPr oxide, alongside potential supply of 7Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.