• Erbium Oxide 99.5%min EXW Chinaup(17)  07-27|Yttrium Oxide 99.999%min EXW Chinaup(1500)  07-27|Met. Coke A 13%max, S 0.7%max EXW Shanxidown(-55)  07-27|Met. Coke A 13%max, S 0.7%max EXW Hebeidown(-55)  07-27|Aluminum Alloy Ingot ADC12 Delivered Indiadown(-8000)  07-27|Lanthanum Oxide 99.999%min EXW Chinaup(1100)  07-27|Yttrium Oxide 99.999%min IW Rotterdamup(15)  07-27|Met. Coke A 13%max, S 0.7%max EXW Shandongdown(-55)  07-27|Lanthanum Oxide 99.999%min FOB Chinaup(0.2)  07-27|Zirconium Carbonate Zr(Hf)O2 40%min, Cl 0.2%max EXW Chinaup(500)  07-27|Zirconium Carbonate Zr(Hf)O2 40%min, Cl 50ppm max EXW Chinaup(500)  07-27|Tin Conc. Burmese 20%min IW MengAup(7000)  07-27|Tin Conc. Burmese 30%min IW MengAup(7000)  07-27|Tin Conc. 60%min Delivered Chinaup(7000)  07-27
  • Samarco reports Q2 2026 production and sales results

    2026-07-27 11:40:30   [Print]
    In a pre-operational disclosure, Brazilian iron ore and pellet producer Samarco reported sales of 3.Asian Metal Copyright Production also gained momentum during the quarter, rising 4% sequentially to 3.Asian Metal Copyright9 million metric tons for the second quarter of 2026, representing a 23% increase from the previous quarter but a slight 1% decrease compared to Q2 2025.Asian Metal Copyright The company attributed the strong quarter-on-quarter sales rebound to a return to normal shipment levels, following a weaker performance in Q1 2026.Asian Metal Copyright The figures reflect combined volumes of iron ore and pellets.

    Production also gained momentum during the quarter, rising 4% sequentially to 3.9 million metric tons and posting a marginal 0.Asian Metal Copyright The company attributed the strong quarter-on-quarter sales rebound to a return to normal shipment levels, following a weaker performance in Q1 2026.Asian Metal Copyright1% year-on-year increase.

    The company attributed the strong quarter-on-quarter sales rebound to a return to normal shipment levels, following a weaker performance in Q1 2026.

    On the production front, Samarco noted that Q2 2026 output indicated operations remained stable at structurally higher levels. For the first half of 2026, production rose 8% year-on-year to 7.Asian Metal Copyright On the production front, Samarco noted that Q2 2026 output indicated operations remained stable at structurally higher levels.Asian Metal Copyright7 million metric tons, while sales increased 4% to 7.Asian Metal Copyright9 million metric tons for the second quarter of 2026, representing a 23% increase from the previous quarter but a slight 1% decrease compared to Q2 2025.Asian Metal Copyright1 million metric tons.

    Samarco, a joint venture between Vale and BHP, continues its recovery from the 2015 Fundao Dam accident and expects to reach full capacity of 26 million metric tons per year by 2028.

    .Asian Metal Copyright1 million metric tonsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.