• Zinc Ingot 99.99%min EXW China down(-820)  09-14|Coal Tar Pitch Coking Value 56%min EXW Chinaup(180)  09-14|Tin Conc. Burmese 20%min IW MengAdown(-10000)  09-14|Tin Conc. Burmese 30%min IW MengAdown(-10000)  09-14|Magnesia D.B. 90%min 3-15mm FOB Chinaup(5)  09-14|Tin Conc. 60%min Delivered Chinadown(-10000)  09-14|Tin Ingot 99.95%min EXW Chinadown(-10000)  09-14|Tin Solder Wire 99.3%min EXW Chinadown(-10)  09-14|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinadown(-3000)  09-14|Tin Solder Bar 60%min EXW Chinadown(-6)  09-14|Lithium Carbonate 99.2%min Delivered Chinadown(-3000)  09-14|Tin Solder Bar 40%min EXW Chinadown(-4)  09-14|Lithium Carbonate 99.5%min Delivered Chinadown(-3000)  09-14|Tin Solder Wire 99%min EXW Chinadown(-10)  09-14
  • XTC New Energy plans 10ktpy lithium-ion cathode material project in Malaysia

    2026-06-29 15:05:31   [Print]
    XTC New Energy Materials (Xiamen) Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright announced plans to establish a wholly-owned subsidiary in Hong Kong, through which it will form a joint venture with EMI in Malaysia.Asian Metal Copyright announced plans to establish a wholly-owned subsidiary in Hong Kong, through which it will form a joint venture with EMI in Malaysia.Asian Metal Copyright The project is set to be located in Ulu Selangor, Selangor Darul Ehsan, Malaysia.Asian Metal Copyright The Malaysian joint venture will invest USD64.Asian Metal Copyright In the long term, the project is expected to boost the company's revenue and profitability, while further strengthening its core business and sustaining long-term operational resilience.Asian Metal Copyright58 million (approximately RMB450 million) to build a 10,000tpy lithium-ion cathode material production facility.

    The project is set to be located in Ulu Selangor, Selangor Darul Ehsan, Malaysia. Under the arrangement, EMI will develop its own land parcel to construct standard industrial facilities tailored to process requirements, and subsequently lease them to the Malaysian joint venture.Asian Metal CopyrightXTC New Energy Materials Xiamen Co.Asian Metal Copyright The joint venture will then carry out adaptive renovations, retrofitting, and equipment installation to rapidly deploy the 10,000tpy cathode material production line.Asian Metal Copyright Construction is scheduled to commence in September 2026 and conclude in June 2027, with a total timeline of 10 months.Asian Metal Copyright Construction is scheduled to commence in September 2026 and conclude in June 2027, with a total timeline of 10 months.

    Once operational, the new facility will add 10,000tpy of lithium-ion cathode material capacity. In the long term, the project is expected to boost the company's revenue and profitability, while further strengthening its core business and sustaining long-term operational resilience.


    .Asian Metal Copyright The project is set to be located in Ulu Selangor, Selangor Darul Ehsan, MalaysiaAsian Metal Copyright
    Lithium Iron Phosphate Li 3.9%min Delivered China
    Unit:RMB/mt
    Lithium Iron Phosphate Li 3.9%min Delivered China RMB/mt
    China's ithium iron phosphate producers' output statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.