• Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinadown(-100)  05-20|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinadown(-100)  05-20|Zinc Conc. 50%min CIF China TCdown(-5)  05-20|Tungsten Scrap THA 90%min Ex-VAT Delivered Chinadown(-100)  05-20|Tungsten Ore WO3 55%min EXW Chinadown(-30000)  05-20|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinadown(-500)  05-20|Tungsten Bar W-4 99.9%min EXW Chinadown(-100)  05-20|Tungsten Oxide WO3 99.95%min EXW Chinadown(-50000)  05-20|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinadown(-100)  05-20|Ferro-tungsten 70%min EXW Chinadown(-40000)  05-20|Ferro-tungsten 75%min EXW Chinadown(-40000)  05-20|Ferro-tungsten 75%min FOB Chinadown(-10)  05-20|Tungsten APT 88.5%min EXW Chinadown(-30000)  05-20|Tungsten APT 88.5%min FOB Chinadown(-70)  05-20
  • Hengyitong receives approval to build rare earth metal project

    2026-05-20 15:48:24   [Print]
    Baotou Hengyitong Rare Earth Co.Asian Metal CopyrightBaotou Hengyitong Rare Earth Co.Asian Metal Copyright, Ltd.Asian Metal Copyright41 million, all of which will be funded by the company itself.Asian Metal Copyright has received the initial approval from the Department of Industry and Information Technology of Inner Mongolia Autonomous Region to build a 6,000tpa rare earth metal project.

    The project will be located in the Baotou Kundulun Economic and Technological Development Zone in Inner Mongolia. It is designed to produce 6,000 tonnes of rare earth metals annually, including 2,000 tonnes of PrNd metal, 1,000 tonnes of LaCe metal, 2,000 tonnes of cerium metal and 1,000 tonnes of lanthanum metal.

    Construction will involve using the company's existing production workshops to build a 6,000 tpa rare earth metal production line along with supporting utilities and infrastructure.

    The total investment is RMB57.26 million (USD8.Asian Metal Copyright The total investment is RMB57.Asian Metal Copyright41 million), all of which will be funded by the company itself.Asian Metal Copyright41 million, all of which will be funded by the company itself.Asian Metal Copyright It is expected to take 24 months to complete construction.
    .Asian Metal Copyright26 million USD8Asian Metal Copyright
    Cerium Metal 99%min EXW China
    Unit:RMB/mt
    Cerium Metal 99%min EXW China RMB/mt
    China cerium metal producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.