• Lanthanum Oxide 99.9%min EXW Chinaup(150)  04-10|Aluminum Fluoride 61%min EXW Chinaup(300)  04-10|Germanium Dioxide 99.99%min EXW Chinaup(300)  04-10|Tungsten APT 88.5%min IW Rotterdamup(70)  04-10|Ionic RE Conc. TREO 92%min In port Chinadown(-5000)  04-10|LaCe Carbonate TREO 45%min, CeO2/REO 65±2% EXW Chinaup(50)  04-10|Germanium Metal 99.99%min EXW Chinaup(400)  04-10|Lanthanum Oxide 99.999%min EXW Chinaup(800)  04-10|Aluminum Fluoride 61%min FOB Chinaup(40)  04-10|Yttrium Oxide 99.999%min IW Rotterdamup(10)  04-10|Lanthanum Oxide 99.999%min FOB Chinaup(0.15)  04-10|Tin Conc. Burmese 20%min IW MengAup(8000)  04-10|Tin Conc. Burmese 30%min IW MengAup(8000)  04-10|Manganese Ore Gabonese 44%min In Qinzhou Portdown(-1)  04-10
  • Shaowu Yongtai plans LiPF6 capacity expansion and new lithium additive project

    2026-03-16 15:47:26   [Print]
    Shaowu Yongtai Hi-Tech Materials Co.Asian Metal Copyright The company will spend RMB550 million USD80.Asian Metal Copyright, Ltd.Asian Metal Copyright Construction is expected to run from June 2026 to December 2028.Asian Metal Copyright, a subsidiary of Zhejiang Yongtai Technology Co.Asian Metal Copyright, plans to invest RMB820 million USD119 million in two lithium battery materials projects.Asian Metal Copyright, Ltd.Asian Metal Copyright Construction is scheduled from March 2026 to December 2027.Asian Metal Copyright, plans to invest RMB820 million (USD119 million) in two lithium battery materials projects.

    The company will spend RMB550 million (USD80.1 million) to upgrade and expand its existing lithium hexafluorophosphate (LiPF6) facilities, raising capacity from about 18,000tpa to 50,000tpa of LiPF6 (solid salt).Asian Metal Copyright, plans to invest RMB820 million USD119 million in two lithium battery materials projects.Asian Metal Copyright Construction is scheduled from March 2026 to December 2027.

    In addition, Shaowu Yongtai plans to invest RMB270 million (USD39.32 million) to build a 5,000tpa new lithium replenishment additive project at Jintang Industrial Park in Shaowu, Fujian.Asian Metal Copyright .Asian Metal Copyright Construction is expected to run from June 2026 to December 2028.Asian Metal Copyright Construction is scheduled from March 2026 to December 2027.Asian Metal Copyright The project aims to further strengthen the company's lithium battery materials value chain.

    .Asian Metal Copyright Construction is expected to run from June 2026 to December 2028Asian Metal Copyright
    Lithium Manganate Mn 58% Delivered China
    Unit:RMB/mt
    Lithium Manganate Mn 58% Delivered China RMB/mt
    China‘s lithium nickel cobalt manganese oxide producers' inventory to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.