• Yttrium Oxide 99.999%min In warehouse Rotterdamup(25)  12-05|Zinc Conc. TC 50%min CIF Chinadown(-5)  12-05|Selenium Dioxide 98%min Delivered Chinadown(-4)  12-05|Antimony Trioxide 99.5%min In warehouse Baltimoredown(-0.8)  12-05|Calcined Pet Coke S 3%max EXW Chinaup(100)  12-05|Antimony Ingot 99.65%min In warehouse Baltimoredown(-0.7)  12-05|Antimony Trioxide 99.5%min In warehouse Rotterdamdown(-1)  12-05|Rebar HRB400 20mm In warehouse Shanghaiup(80)  12-05|Yttrium Oxide 99.999%min FOB Chinaup(0.5)  12-05|Manganese Ore Brazilian 44%min In Tianjin Portup(1)  12-05|Manganese Ore Gabonese 44%min In Tianjin Portup(1)  12-05|Manganese Ore Australian 45%min In Tianjin Portup(1)  12-05|Antimony Ingot 99.65%min In port Indiadown(-100)  12-05|Ferro-vanadium 50%min In warehouse Russiaup(20)  12-05
  • Northern Gold Dragon gets approval to build rare earth separation project

    2025-10-20 14:09:45   [Print]
    Northern Gold Dragon (Baotou) Rare Earth Co.Asian Metal Copyright The project involves capacity replacement and does not add any additional capacity quota.Asian Metal Copyright, Ltd.Asian Metal Copyright With a total investment of about RMB470 million USD65.Asian Metal Copyright has received approval from the Inner Mongolia Department of Industry and Information Technology to build a rare earth separation project with an annual capacity of 5,000 tonnes of REO, mainly including lanthanum oxide, cerium oxide, praseodymium-neodymium oxide, neodymium oxide, samarium oxide, europium oxide, gadolinium oxide, terbium oxide, dysprosium oxide, holmium oxide, erbium oxide, thulium oxide, lutetium oxide, and yttrium oxide.

    The project involves capacity replacement and does not add any additional capacity quota. With a total investment of about RMB470 million (USD65.Asian Metal CopyrightNorthern Gold Dragon Baotou Rare Earth Co.Asian Metal Copyright95 million), fully funded by the company, the project is expected to take 21 months to complete.

    .Asian Metal Copyright95 million, fully funded by the company, the project is expected to take 21 months to completeAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.