• Met. Coke A 13%max, S 0.7%max EXW Shanxiup(50)  07-17|Met. Coke A 13%max, S 0.7%max EXW Hebeiup(50)  07-17|Met. Coke A 13%max, S 0.7%max EXW Shandongup(50)  07-17|Tungsten Ore WO3 50%min FOB Africaup(10)  07-17|Rhenium APR 99.99%min EXW Chinaup(250)  07-17|Lanthanum Oxide 99.999%min FOB Chinaup(0.07)  07-17|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinadown(-10)  07-17|Lanthanum Oxide 99.999%min EXW Chinaup(500)  07-17|Praseodymium Oxide 99.5%min FOB Chinaup(1700)  07-17|Tellurium Metal 99.99%min EXW Chinadown(-15)  07-17|Iron Ore Fine Brazilian 65%min In port Chinaup(20)  07-17|Neodymium Oxide 99.5%min FOB Chinaup(1500)  07-17|Chrome Lump S.A. 38%min In port Chinaup(1)  07-17|Iron Ore Fine Australian 58%min In port Chinaup(15)  07-17
  • Northwest China's largest iron ore mining project gets green light

    2025-06-19 14:56:09   [Print]
    The Beizhan Iron Ore Expansion Project in Hejing County, with a designed capacity of 10 million tonnes per year, has been approved by the Xinjiang Uygur Autonomous Region.Asian Metal Copyright .Asian Metal Copyright The approval was granted just 30 working days after submission, setting a new record for the fastest approval of an iron ore project in Xinjiang.

    As the largest iron ore mining project in Northwest China, it involves a total investment of RMB3.25 billion (USD452 million) and includes the construction of new mining and associated facilities.Asian Metal Copyright25 billion USD452 million and includes the construction of new mining and associated facilities.Asian Metal Copyright Scheduled for completion between 2025 and 2028, the project will boost raw ore production capacity from 1.Asian Metal Copyright51 million in annual tax revenue and create over 2,000 jobs.Asian Metal Copyright5 million to 10 million tonnes per year, with an expected annual output of 4.Asian Metal Copyright5 million to 10 million tonnes per year, with an expected annual output of 4.Asian Metal Copyright98 million tonnes of iron concentrate.Asian Metal Copyright It is projected to generate RMB320 million USD44.Asian Metal Copyright It is projected to generate RMB320 million (USD44.Asian Metal Copyright The approval was granted just 30 working days after submission, setting a new record for the fastest approval of an iron ore project in Xinjiang.Asian Metal Copyright51 million) in annual tax revenue and create over 2,000 jobs.

    .Asian Metal Copyright5 million to 10 million tonnes per year, with an expected annual output of 4Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.