• Rhenium APR 99.99%min EXW Chinaup(250)  07-16|Samarium Metal 99.5%min FOB Chinaup(0.3)  07-16|Titanium Tetrachloride 99.99%min EXW Chinadown(-150)  07-16|Vanadium Pentoxide Powder 99%min EXW Chinaup(2000)  07-16|Vanadium Pentoxide Powder 99.5%min EXW Chinaup(2000)  07-16|Silicon Metal 7-8-3 Delivered Chinaup(200)  07-16|Calcium-silicon 30-60 Ex-VAT FOB Chinadown(-30)  07-16|Calcium-silicon 28-55 FOB Chinadown(-30)  07-16|Silicon Metal 5-5-3 Delivered Chinaup(200)  07-16|Calcium-silicon 28-55 EXW Chinadown(-200)  07-16|Silicon Metal 4-4-1 Delivered Chinaup(200)  07-16|Titanium Dioxide R TiO2 93%min, Si/Zr Coating Delivered Chinadown(-300)  07-16|Calcium-silicon 30-60 FOB Chinadown(-30)  07-16|Spodumene Li2O 5%min In port Chinaup(20)  07-16
  • Northwest China's largest iron ore mining project gets green light

    2025-06-19 14:56:09   [Print]
    The Beizhan Iron Ore Expansion Project in Hejing County, with a designed capacity of 10 million tonnes per year, has been approved by the Xinjiang Uygur Autonomous Region.Asian Metal Copyright As the largest iron ore mining project in Northwest China, it involves a total investment of RMB3.Asian Metal Copyright The approval was granted just 30 working days after submission, setting a new record for the fastest approval of an iron ore project in Xinjiang.

    As the largest iron ore mining project in Northwest China, it involves a total investment of RMB3.25 billion (USD452 million) and includes the construction of new mining and associated facilities.Asian Metal Copyright .Asian Metal Copyright Scheduled for completion between 2025 and 2028, the project will boost raw ore production capacity from 1.Asian Metal Copyright .Asian Metal Copyright5 million to 10 million tonnes per year, with an expected annual output of 4.Asian Metal CopyrightThe Beizhan Iron Ore Expansion Project in Hejing County, with a designed capacity of 10 million tonnes per year, has been approved by the Xinjiang Uygur Autonomous Region.Asian Metal Copyright98 million tonnes of iron concentrate.Asian Metal Copyright .Asian Metal Copyright It is projected to generate RMB320 million (USD44.Asian Metal Copyright As the largest iron ore mining project in Northwest China, it involves a total investment of RMB3.Asian Metal Copyright51 million) in annual tax revenue and create over 2,000 jobs.

    .Asian Metal Copyright The approval was granted just 30 working days after submission, setting a new record for the fastest approval of an iron ore project in XinjiangAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.