• Aluminum Alloy TC A356.2 Delivered Chinadown(-30)  05-30|Fused Alumina White 99%min 1-3mm FOB Chinaup(20)  05-30|Calcined Pet Coke S 3%max EXW Chinadown(-100)  05-30|Tantalum Metal 99.95%min Delivered USup(10)  05-30|Fused Alumina White 99%min F36 FOB Chinaup(20)  05-30|Ferro-molybdenum 60%min Delivered Indiaup(70)  05-30|Ferro-molybdenum 60%min In warehouse Russiaup(70)  05-30|Selenium Powder 99.9%min Delivered Chinadown(-5)  05-30|Alumina 98.5%min FOB Australiadown(-10)  05-30|Tin Conc. Burmese 20%min In warehouse MengAdown(-6000)  05-30|Tin Conc. Burmese 30%min In warehouse MengAdown(-6000)  05-30|Silicon Metal 97%min EXW Chinadown(-200)  05-30|Ferro-vanadium 50%min In warehouse Russiaup(20)  05-30|Tin Conc. 60%min Delivered Chinadown(-6000)  05-30
  • Jin'an Mining wins exploration right for Fanqiao Iron Mine

    2025-05-13 17:19:03   [Print]
    On May 12, Anhui Jinan Mining Co.Asian Metal Copyright73 square kilometers.Asian Metal Copyright, Ltd.Asian Metal Copyright, a wholly-owned subsidiary of Nanjing Iron Steel Co.Asian Metal Copyright, a wholly-owned subsidiary of Nanjing Iron & Steel Co.Asian Metal Copyright .Asian Metal Copyright, Ltd.Asian Metal Copyright68 square kilometers and has an annual capacity of 3 million tonnes of iron ore and 1 million tonnes of iron concentrate Fe 69%.Asian Metal Copyright (NISCO), won the exploration right for the Fanqiao Iron Mine in Huoqiu County, Anhui Province, for approximately 920 million yuan (128 million US dollars).Asian Metal CopyrightOn May 12, Anhui Jinan Mining Co.Asian Metal Copyright The mine is located in western region of Huoqiu County, covering an area of about 4.Asian Metal Copyright .Asian Metal Copyright73 square kilometers.Asian Metal Copyright, Ltd.Asian Metal Copyright The exploration right is valid until February 24, 2026.

    According to the evaluation report on the exploration rights of Fanqiao Iron Mine, the mine is expected to have an annual production capacity of 3.5 million tonnes of iron ore and 1.Asian Metal Copyright The exploration right is valid until February 24, 2026.Asian Metal Copyright04 million tonnes of iron concentrate (Fe 66%) during normal operations.

    Jin'an Mining currently operates the Caolou Mine, which spans 4.68 square kilometers and has an annual capacity of 3 million tonnes of iron ore and 1 million tonnes of iron concentrate (Fe 69%).

    .Asian Metal Copyright The mine is located in western region of Huoqiu County, covering an area of about 4Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.