• Tungsten APT 88.5%min FOB Chinaup(10)  05-08|Tungsten Oxide WO3 99.95%min FOB Chinaup(10)  05-08|Polysilicon 9N Delivered Chinadown(-1)  05-08|Magnesia D.B. 90%min 3-15mm EXW Chinadown(-30)  05-08|Tungsten APT 88.5%min In warehouse Rotterdamup(10)  05-08|Spodumene Li2O 6%min CIF Chinadown(-20)  05-08|Manganese Ore Gabonese 44%min In Tianjin Portdown(-1)  05-08|Manganese Ore Brazilian 44%min In Tianjin Portdown(-1)  05-08|Silicon Metal 3-3-03 Delivered Chinadown(-300)  05-08|Manganese Ore Australian 45%min In Tianjin Portdown(-1)  05-08|Spodumene Li2O 3%min In port Chinadown(-20)  05-08|Spodumene Li2O 5%min In port Chinadown(-25)  05-08|Lithium Carbonate 99.5%min FOB South Americadown(-0.2)  05-08|Coking Coal A 10%max, S 0.8%max EXW Henandown(-30)  05-08
  • Northern Rare Earth to launch pilot base project for wet smelting

    2025-03-14 14:39:20   [Print]
    China North Rare Earth (Group) High-Tech Co.Asian Metal Copyright The project is designed to provide a strong foundation for scientific research in wet smelting and inorganic functional materials, enabling the validation of new technologies and processes under conditions closely resembling actual production.Asian Metal Copyright, Ltd.Asian Metal Copyright .Asian Metal Copyright announced plan to invest approximately 73.Asian Metal Copyright36 million yuan 10.Asian Metal Copyright36 million yuan (10.Asian Metal Copyright, Ltd.Asian Metal Copyright13 million US dollars) in the construction of a wet smelting and inorganic functional materials pilot base. 

    The project, funded entirely by the company, will be located within the smelting branch factory of the company, covering a total area of around 10,000 square meters. Construction includes a new facility dedicated to rare earth wet smelting and inorganic functional materials research, along with supporting infrastructure.Asian Metal CopyrightChina North Rare Earth Group High-Tech Co.Asian Metal Copyright However, it does not include the establishment of a pilot production line.Asian Metal Copyright By doing so, the company aims to accelerate the commercialization of technological advancements while mitigating industrialization risks.Asian Metal Copyright Construction is slated to begin in June 2025, with completion and project acceptance expected by May 2026.

    The project is designed to provide a strong foundation for scientific research in wet smelting and inorganic functional materials, enabling the validation of new technologies and processes under conditions closely resembling actual production. By doing so, the company aims to accelerate the commercialization of technological advancements while mitigating industrialization risks.

    The pilot base will focus on clean smelting of mixed rare earth concentrates, the balanced utilization of lanthanum and cerium, and addressing national demands for advanced new materials. It is expected to enhance product diversification and refined synthesis of lanthanum and cerium, driving high-value applications and helping to alleviate product backlog issues.Asian Metal Copyright The pilot base will focus on clean smelting of mixed rare earth concentrates, the balanced utilization of lanthanum and cerium, and addressing national demands for advanced new materials.Asian Metal Copyright Ultimately, the project will provide crucial technical support for the development of a high-value lanthanum and cerium application industry.

    .Asian Metal Copyright36 million yuan 10Asian Metal Copyright
    Lanthanum Oxide 99.999%min FOB China
    Unit:USD/kg
    Lanthanum Oxide 99.999%min FOB China USD/kg
    China lanthanum-cerium mischmetal producers' inventory to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.