• Copper Conc. TC 25%min CIF Chinadown(-3)  07-04|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-04|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-50)  07-04|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-50)  07-04|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-100)  07-04|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(8)  07-04|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-04|Selenium Powder 99.9%min Delivered Indiaup(50)  07-04|Chrome Lump S.A. 38%min In port Chinadown(-1)  07-04|Silico-manganese 60/14 EXW Chinaup(100)  07-04|Silico-manganese 65/17 EXW Chinaup(100)  07-04|Rebar HRB400 20mm In warehouse Guangzhouup(50)  07-04|Flake Graphite +195 EXW Chinadown(-100)  07-04|Ferro-silicon 75%min In warehouse Rotterdamdown(-20)  07-04
  • Wanrun New Material to build LFP plant in U.S.

    2024-09-24 12:02:17   [Print]
    Hubei Wanrun New Material Supply Chain Management Co.Asian Metal Copyright subsidiaries, for the development of a cathode materials production and RD project.Asian Metal Copyright, Ltd.Asian Metal Copyright .Asian Metal Copyright, a wholly-owned subsidiary of Hubei WanRun New Energy Technology Co.Asian Metal Copyright, plans to invest about USD168 million to set up Wrestore Technology LLC in Delaware U.Asian Metal Copyright, Ltd.Asian Metal Copyright .Asian Metal Copyright, plans to invest about USD168 million to set up Wrestore Technology LLC in Delaware U.Asian Metal Copyright Construction of the project would take around 30 months to complete, with full production scheduled to begin in 2028.Asian Metal CopyrightS.Asian Metal Copyright .Asian Metal Copyright, through its wholly-owned U.Asian Metal Copyright, through its wholly-owned U.Asian Metal CopyrightS.Asian Metal Copyright, Ltd.Asian Metal Copyright subsidiaries, for the development of a cathode materials production and R&D project.

    The project has a designed production capacity of 50,000tpa of lithium iron phosphate (LFP), including 9,000tpa for the first phase. Construction of the project would take around 30 months to complete, with full production scheduled to begin in 2028.

    .Asian Metal CopyrightSAsian Metal Copyright
    Lithium Carbonate 99.5%min Delivered EU
    Unit:USD/kg
    Lithium Carbonate 99.5%min Delivered EU USD/kg
    China lithium carbonate 99.5%mi producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.