• Copper Cathode 99.99%min Delivered Chinaup(2400)  09-25|Cobalt Chloride 24%min Delivered Chinaup(2000)  09-25|Ammonium Metavanadate 98%min EXW Chinadown(-2000)  09-25|Selenium Powder 99.9%min Delivered Chinadown(-5)  09-25|Ferro-silicon 75%min In warehouse Pittsburghdown(-0.03)  09-25|Copper Conc. 20%min Delivered Chinaup(2000)  09-25|Cobalt Sulfate 20.5%min Delivered Chinaup(1500)  09-25|Copper Scrap Wire 99%min Delivered Chinaup(2000)  09-25|Cobalt Oxide 72%min Delivered Chinaup(5)  09-25|Cobalt Tetroxide 73.5%min Delivered Chinaup(5)  09-25|Ferro-silicon 70%min EXW Indiadown(-2000)  09-25|Selenium Powder 99.95%min Delivered Chinadown(-5)  09-25|NdFeB Sintered Rough N35 EXW Chinadown(-3)  09-25|Cobalt Powder 99.5%min Delivered Chinaup(6)  09-25
  • Construction kicks off for 100ktpa LMFP project in Huocheng

    2024-04-17 11:53:06   [Print]
    On April 15, Xinjiang Jiuchen New Material Technology Co.Asian Metal Copyright .Asian Metal Copyright, Ltd.Asian Metal Copyright With a total investment of RMB4 billion USD553 million, the project is expected to achieve an annual sales revenue of RMB15 billion USD2.Asian Metal Copyright broke ground on its 100,000tpa LMFP cathode material project at the new material industrial park in Huocheng, Xinjiang.

    The first phase of the project will build two LMFP production lines which are scheduled to come on stream by the end of the year. The second phase includes two LMFP production lines and two precursor production lines, which are planned to become operationally in 2025.

    The project, with a land area of 308Mu (20.53 hectares) and floor area of 150,000 square meters, will mainly produce cathode material for NEV battery, and a new battery plant will be built in the second phase.Asian Metal Copyright, Ltd.Asian Metal Copyright With a total investment of RMB4 billion (USD553 million), the project is expected to achieve an annual sales revenue of RMB15 billion (USD2.Asian Metal Copyright07 billion and help create 400 to 600 jobs.Asian Metal Copyright07 billion) and help create 400 to 600 jobs.

    .Asian Metal Copyright53 hectares and floor area of 150,000 square meters, will mainly produce cathode material for NEV battery, and a new battery plant will be built in the second phaseAsian Metal Copyright
    Lithium Iron Phosphate Li 3.9%min Delivered China
    Unit:RMB/mt
    Lithium Iron Phosphate Li 3.9%min Delivered China RMB/mt
    China's ithium iron phosphate producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.