• Antimony Trioxide 99.5%min In warehouse Baltimoreup(0.8)  05-09|Silicon Metal 5-5-3 Delivered Europedown(-50)  05-09|Spodumene Li2O 6%min CIF Chinadown(-20)  05-09|Manganese Ore Australian 45%min In Tianjin Portdown(-1)  05-09|Spodumene Li2O 3%min In port Chinadown(-20)  05-09|Silicon Metal 4-4-1 Delivered Europedown(-50)  05-09|Antimony Ingot 99.65%min In warehouse Rotterdamup(1500)  05-09|Terbium Metal 99.9%min FOB Chinaup(30)  05-09|Dysprosium Oxide 99.5%min EXW Chinaup(40)  05-09|Manganese Ore Brazilian 44%min In Qinzhou Portdown(-1)  05-09|Ferro-titanium 70%min Delivered USdown(-0.2)  05-09|Manganese Ore 38%min FOB S.A. up(0.07)  05-09|Terbium Metal 99.9%min EXW Chinaup(200)  05-09|Stainless Bar 304 60mm In warehouse Dainandown(-300)  05-09
  • XTC New Energy to develop 40ktpa ternary materials project in France

    2023-09-27 11:56:06   [Print]
    XTC New Energy Materials (Xiamen) Co.Asian Metal Copyright Phase one of the project, with capacity of 20,000tpa, would finish construction and begin trial operation in Q4 2025, and the phase two is expected to complete construction in Q3 2027.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright plans to set up a joint venture through its subsidiary XTC New Energy Materials Europe GmbH with Orano CAM to develop a ternary materials project in France.Asian Metal Copyright The proposed joint venture, XTC France New Energy Materials, is 51% owned by XTC New Energy Materials Europe and 49% owned by Orano CAM, with investment of EUR10.Asian Metal Copyright The proposed joint venture, XTC France New Energy Materials, is 51% owned by XTC New Energy Materials Europe and 49% owned by Orano CAM, with investment of EUR10.Asian Metal Copyright XTC France New Energy will invest RMB3.Asian Metal Copyright20 million and EUR9.Asian Metal Copyright Phase one of the project, with capacity of 20,000tpa, would finish construction and begin trial operation in Q4 2025, and the phase two is expected to complete construction in Q3 2027.Asian Metal Copyright80 million respectively from the two companies.

    XTC France New Energy will invest RMB3.96 billion (USD542 million) to build a production line with capacity of 40,000tpa of ternary materials.Asian Metal Copyright Phase one of the project, with capacity of 20,000tpa, would finish construction and begin trial operation in Q4 2025, and the phase two is expected to complete construction in Q3 2027.Asian Metal Copyright The project consists of two phases and construction is expected to take about 44 months.Asian Metal CopyrightXTC New Energy Materials Xiamen Co.Asian Metal Copyright Phase one of the project, with capacity of 20,000tpa, would finish construction and begin trial operation in Q4 2025, and the phase two is expected to complete construction in Q3 2027.

    .Asian Metal Copyright20 million and EUR9Asian Metal Copyright
    Lithium Manganate Mn 58% Delivered China
    Unit:RMB/mt
    Lithium Manganate Mn 58% Delivered China RMB/mt
    China‘s lithium nickel cobalt manganese oxide producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.