• Manganese Ore S.A. 36%min In Tianjin Port(3)  05-11|Manganese Ore S.A. 37%min In Tianjin Port(3)  05-11|Manganese Ore Gabonese 44%min In Tianjin Port(3)  05-11|Manganese Ore Carbonate, Mn 13%min EXW China(2)  05-11|Manganese Ore S.A. 36%min In Qinzhou Port(2.5)  05-11|Manganese Ore S.A. 37%min In Qinzhou Port(2.5)  05-11|Manganese Ore Gabonese 44%min In Qinzhou Port(2.5)  05-11|Manganese Ore Brazilian 44%min In Qinzhou Port(2.5)  05-11|Manganese Ore Australian 45%min In Qinzhou Port(2.5)  05-11|Manganese Ore Australian 45%min In Tianjin Port(2.5)  05-11|Manganese Ore Brazilian 44%min In Tianjin Port(2.5)  05-11|Copper Conc. TC 25%min CIF China(-1)  05-11|Dysprosium Oxide 99.5%min EXW China(60)  05-11|Lithium Hydroxide Monohydrate LiOH 56.5%min, Magnets 0.0001%max Delivered China(-3000)  05-11
  • 200ktpy LMFP project breaks ground in Yancheng, Jiangsu

    2023-06-28 11:49:18   [Print]
    On June 25, a groundbreaking ceremony for a number of projects was held in Xiangshui, Yancheng, Jiangsu.Asian Metal Copyright The 200,000tpy LMFP cathode material project invested and developed by Qingdao Qianyun High-tech New Materials Co.Asian Metal Copyright The 200,000tpy LMFP cathode material project invested and developed by Qingdao Qianyun High-tech New Materials Co.Asian Metal CopyrightOn June 25, a groundbreaking ceremony for a number of projects was held in Xiangshui, Yancheng, Jiangsu.Asian Metal Copyright, Ltd.Asian Metal Copyright The 200,000tpy LMFP cathode material project invested and developed by Qingdao Qianyun High-tech New Materials Co.Asian Metal Copyright broke ground on that day and will be built in two phases with total investmet of RMB5 billion (USD693 million).

    The first phase of the project, with a land area of 180Mu (12 hectares) and investment of RMB2.5 billion (USD346 million), will add 22 production lines with total capacity of 100,000tpy of LMFP.Asian Metal Copyright The first phase of the project, with a land area of 180Mu 12 hectares and investment of RMB2.Asian Metal Copyright When the phase one becomes operational, it is expected to achieve annual sales of over RMB10 billion (USD1.Asian Metal Copyright The first phase of the project, with a land area of 180Mu 12 hectares and investment of RMB2.Asian Metal Copyright39 billion) and create more than 100 jobs.

    .Asian Metal Copyright The first phase of the project, with a land area of 180Mu 12 hectares and investment of RMB2Asian Metal Copyright
    Lithium Iron Phosphate Li 3.9%min Delivered China
    Unit:RMB/mt
    China lithium hydroxide monohydrate producers; suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.