• Antimony Trioxide 99.5%min In warehouse Baltimoreup(0.8)  05-09|Silicon Metal 5-5-3 Delivered Europedown(-50)  05-09|Spodumene Li2O 6%min CIF Chinadown(-20)  05-09|Manganese Ore Australian 45%min In Tianjin Portdown(-1)  05-09|Spodumene Li2O 3%min In port Chinadown(-20)  05-09|Silicon Metal 4-4-1 Delivered Europedown(-50)  05-09|Antimony Ingot 99.65%min In warehouse Rotterdamup(1500)  05-09|Terbium Metal 99.9%min FOB Chinaup(30)  05-09|Dysprosium Oxide 99.5%min EXW Chinaup(40)  05-09|Manganese Ore Brazilian 44%min In Qinzhou Portdown(-1)  05-09|Ferro-titanium 70%min Delivered USdown(-0.2)  05-09|Manganese Ore 38%min FOB S.A. up(0.07)  05-09|Terbium Metal 99.9%min EXW Chinaup(200)  05-09|Stainless Bar 304 60mm In warehouse Dainandown(-300)  05-09
  • Tibet Mining announces 2023 production guidance for chromite and lithium concentrate

    2023-05-23 15:02:30   [Print]
    Tibet Mining plans to produce 110,000t of chromite and 9,500t of lithium concentrate in 2023, according to a recent disclosure of information by the company.

    The company says the Zabuye salt lake comprehensive development and utilization project with an annual production of nearly 10,000t of battery grade lithium carbonate has completed the first hoisting of steel structure and is expected to finish construction in 2024.

    .Asian Metal CopyrightTibet Mining plans to produce 110,000t of chromite and 9,500t of lithium concentrate in 2023, according to a recent disclosure of information by the companyAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.