• Spodumene Li2O 6%min CIF Chinaup(25)  08-12|Lithium Carbonate 99.2%min Delivered Chinaup(2200)  08-12|Spodumene Li2O 3%min In port Chinaup(25)  08-12|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(2000)  08-12|Lithium Carbonate 99.5%min Delivered Chinaup(2200)  08-12|Ferro-phosphorus 23%min FOB Chinadown(-10)  08-12|Ferro-silicon 75%min In warehouse Pittsburghup(0.03)  08-12|Lithium Manganate Mn 58% Delivered Chinaup(800)  08-12|Spodumene Li2O 5%min In port Chinaup(30)  08-12|Cobalt Oxide 72%min Delivered Chinaup(5)  08-12|Yttrium Oxide 99.999%min In warehouse Rotterdamup(1.5)  08-12|Yttrium Oxide 99.999%min FOB Chinaup(0.3)  08-12|Ferro-tungsten 75%min FOB Chinaup(1.5)  08-12|Rebar BS4449 GR500 16mm In warehouse Kuala Lumpurup(50)  08-12
  • BMW Brilliance Automotive launches building of 6th generation power battery project

    2023-05-19 17:22:48   [Print]
    BMW Brilliance Automotive announced on May 18th that it will start producing pure electric BMW New Century models in 2026.Asian Metal Copyright The company now completely launches the building of the supporting BMW 6th power battery project, which has a total investment of RMB10 billion USD1.Asian Metal Copyright The company now completely launches the building of the supporting BMW 6th power battery project, which has a total investment of RMB10 billion (USD1.Asian Metal CopyrightBMW Brilliance Automotive announced on May 18th that it will start producing pure electric BMW New Century models in 2026.Asian Metal Copyright42 billion) and a planned area of 240,000 square meters, 5 times the area of existing power battery plant.Asian Metal Copyright Integrating RD, purchasing and production, BWM Shenyang Production Base could produce as high as 830,000 vehicles per year with a total output of more than 5 million vehicles so far, becoming one of BMW's largest production bases and most important new energy vehicle centers worldwide.Asian Metal Copyright In addition, BWM Shenyang R&D Center Phase Two Expansion Project goes into formal operation currently, indicating that the company's new energy vehicle localization whole-process development and verification capacities will be improved further.

    Integrating R&D, purchasing and production, BWM Shenyang Production Base could produce as high as 830,000 vehicles per year with a total output of more than 5 million vehicles so far, becoming one of BMW's largest production bases and most important new energy vehicle centers worldwide.


    .Asian Metal Copyright The company now completely launches the building of the supporting BMW 6th power battery project, which has a total investment of RMB10 billion USD1Asian Metal Copyright
    Lithium Iron Phosphate Li 3.9%min Delivered China
    Unit:RMB/mt
    Lithium Iron Phosphate Li 3.9%min Delivered China RMB/mt
    China's ithium iron phosphate producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.