• Titanium Slag TiO2 90%min EXW Chinadown(-200)  07-15|Titanium Dioxide R TiO2 93%min, Si/Zr Coating Delivered Chinadown(-400)  07-15|Rhenium APR 99.99%min EXW Chinaup(250)  07-15|Cobalt Tetroxide 73.5%min Delivered Chinaup(5)  07-15|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinaup(80)  07-15|Cobalt Chloride 24%min Delivered Chinaup(1500)  07-15|Polysilicon 9N Delivered Chinaup(1)  07-15|Titanium Tetrachloride 99.99%min EXW Chinadown(-150)  07-15|Fluorspar 97%min Delivered Chinadown(-80)  07-15|Cobalt Carbonate 46%min Delivered Chinaup(3000)  07-15|Silicon Metal 97%min EXW Chinaup(200)  07-15|Titanium Dioxide R TiO2 93%min FOB Chinadown(-50)  07-15|Copper Conc. TC 25%min CIF Chinadown(-1)  07-15|Fused Alumina Brown 95%min 1-3mm In warehouse Rotterdamdown(-20)  07-15
  • China Kings Resources Group to invest in fluorine-contained Li-battery material and fluorite project

    2021-10-13 15:06:06   [Print]
    China Kings Resources Group announced that it signed a project investment agreement with the administration commission of Zhejiang-based Jiangshan Economic Development Zone, planning to construct a 25,000tpy fluorine-contained Li-battery material and matching 80,000tpy fluorite project in the development zone.Asian Metal Copyright Phase one will have 6,000tpy lithium hexafluorophosphate production capacity and 80,000tpy fluorite concentrate mining and beneficiation capacity, Phase two will have a 9,000tpy lithium hexafluorophosphate production capacity, and Phase three will have a 10,000tpy lithium hexafluorophosphate and lithium difluorosulfonimide production capacity.Asian Metal Copyright The three-phased project will have a proposed total investment of about RMB1.Asian Metal Copyright Phase one will have 6,000tpy lithium hexafluorophosphate production capacity and 80,000tpy fluorite concentrate mining and beneficiation capacity, Phase two will have a 9,000tpy lithium hexafluorophosphate production capacity, and Phase three will have a 10,000tpy lithium hexafluorophosphate and lithium difluorosulfonimide production capacity.Asian Metal Copyright55 billion (USD0.Asian Metal Copyright Phase one will have 6,000tpy lithium hexafluorophosphate production capacity and 80,000tpy fluorite concentrate mining and beneficiation capacity, Phase two will have a 9,000tpy lithium hexafluorophosphate production capacity, and Phase three will have a 10,000tpy lithium hexafluorophosphate and lithium difluorosulfonimide production capacity.Asian Metal Copyright24 billion) and is expected to be built within six years.Asian Metal Copyright .Asian Metal Copyright Phase one will have 6,000tpy lithium hexafluorophosphate production capacity and 80,000tpy fluorite concentrate mining and beneficiation capacity, Phase two will have a 9,000tpy lithium hexafluorophosphate production capacity, and Phase three will have a 10,000tpy lithium hexafluorophosphate and lithium difluorosulfonimide production capacity.

    .Asian Metal Copyright Phase one will have 6,000tpy lithium hexafluorophosphate production capacity and 80,000tpy fluorite concentrate mining and beneficiation capacity, Phase two will have a 9,000tpy lithium hexafluorophosphate production capacity, and Phase three will have a 10,000tpy lithium hexafluorophosphate and lithium difluorosulfonimide production capacityAsian Metal Copyright
    Lithium Metal 99%min Delivered China
    Unit:RMB/mt
    Lithium Metal 99%min Delivered China RMB/mt
    Chna's lithium hydroxide producers; suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.