• Lead Conc. TC 50%min CIF Chinadown(-2)  09-20|Zinc Conc. TC 50% CIF Chinadown(-2)  09-20|Copper Conc. TC 25%min CIF Chinadown(-1)  09-20|Vanadium Pentoxide Flake 98%min EXW Chinadown(-2000)  09-20|Polysilicon 9N Delivered Chinaup(1)  09-20|Cobalt Metal 99.8%min In warehouse Rotterdamdown(-0.3)  09-20|Germanium Metal 99.99%min Delivered Europeup(70)  09-20|Germanium Metal 99.99%min Delivered USup(70)  09-20|Silicon Carbide Black 88%min 0-10mm In warehouse Rotterdamdown(-20)  09-20|Fused Alumina Brown 95%min 1-3mm In warehouse Rotterdamdown(-20)  09-20|Silicon Metal 5-5-3 Delivered Europedown(-50)  09-20|Gallium Metal 99.99%min FOB Chinaup(10)  09-20|Fused Alumina White 99%min 1-3mm In warehouse Rotterdamdown(-20)  09-20|Silicon Metal 4-4-1 Delivered Europedown(-50)  09-20
  • China Kings Resources Group to invest in fluorine-contained Li-battery material and fluorite project

    2021-10-13 15:06:06   [Print]
    China Kings Resources Group announced that it signed a project investment agreement with the administration commission of Zhejiang-based Jiangshan Economic Development Zone, planning to construct a 25,000tpy fluorine-contained Li-battery material and matching 80,000tpy fluorite project in the development zone.Asian Metal Copyright Phase one will have 6,000tpy lithium hexafluorophosphate production capacity and 80,000tpy fluorite concentrate mining and beneficiation capacity, Phase two will have a 9,000tpy lithium hexafluorophosphate production capacity, and Phase three will have a 10,000tpy lithium hexafluorophosphate and lithium difluorosulfonimide production capacity.Asian Metal Copyright The three-phased project will have a proposed total investment of about RMB1.Asian Metal Copyright .Asian Metal Copyright55 billion (USD0.Asian Metal Copyright .Asian Metal Copyright24 billion) and is expected to be built within six years.Asian Metal CopyrightChina Kings Resources Group announced that it signed a project investment agreement with the administration commission of Zhejiang-based Jiangshan Economic Development Zone, planning to construct a 25,000tpy fluorine-contained Li-battery material and matching 80,000tpy fluorite project in the development zone.Asian Metal Copyright Phase one will have 6,000tpy lithium hexafluorophosphate production capacity and 80,000tpy fluorite concentrate mining and beneficiation capacity, Phase two will have a 9,000tpy lithium hexafluorophosphate production capacity, and Phase three will have a 10,000tpy lithium hexafluorophosphate and lithium difluorosulfonimide production capacity.

    .Asian Metal Copyright The three-phased project will have a proposed total investment of about RMB1Asian Metal Copyright
    Lithium Cobaltate Co 60%min Delivered China
    Unit:RMB/kg
    Lithium Cobaltate Co 60%min Delivered China RMB/kg
    China lithium carbonate 99.5%mi producers' inventory to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.