• PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(20000)  08-20|Neodymium Oxide 99.5%min EXW Chinaup(20000)  08-20|Spodumene Li2O 6%min CIF Chinaup(30)  08-20|Praseodymium Oxide 99.5%min FOB Chinaup(2500)  08-20|PrNd Mischmetal Pr 25%, Nd 75% FOB Chinaup(3)  08-20|Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinaup(2)  08-20|Praseodymium Oxide 99.5%min EXW Chinaup(18000)  08-20|Tungsten Ore WO3 55%min EXW Chinaup(6000)  08-20|Neodymium Metal 99%min FOB Chinaup(3)  08-20|Neodymium Oxide 99.5%min FOB Chinaup(2500)  08-20|Tungsten Bar W-4 99.9%min FOB Chinaup(2)  08-20|Tungsten Ore WO3 65%min EXW Chinaup(6000)  08-20|PrNd Mischmetal Pr 25%, Nd 75% EXW Chinaup(20000)  08-20|Spodumene Li2O 5%min In port Chinaup(35)  08-20
  • Tianqi Lithium starts constructing battery grade lithium carbonate project

    2018-11-07 16:16:33   [Print]
    It's reported that Tianqi Lithium starts the construction of its 20,000tpy battery grade lithium carbonate project in Suining, Sichuan recently.

    The government of Anju district in Suining signed an agreement with Tianqi Lithium on December 14th, 2017. According to the agreement, Tianqi Lithium will settle a plant for its most advanced lithium material in Anju district.Asian Metal Copyright At the same time as the construction of the first phase project, the work related to the second phase project of 23,000tpy lithium chloride will be conducted.Asian Metal Copyright The project will become an important part to help Tianqi Lithium realize its production capacity target of 100,00tpy lithium chemical products by 2020.

    It's learned that the project will be constructed in two phases. In particular, the first phase project of 20,000tpy battery grade lithium carbonate is expected to be constructed completely and go into production in 2020.Asian Metal Copyright According to the agreement, Tianqi Lithium will settle a plant for its most advanced lithium material in Anju district.Asian Metal Copyright The first phase project will produce lithium carbonate, an important raw material to produce lithium ion battery, as well as anhydrous sodium sulfate, lithium-silicon powder, industrial gypsum and other by-products.Asian Metal Copyright In particular, the first phase project of 20,000tpy battery grade lithium carbonate is expected to be constructed completely and go into production in 2020.Asian Metal Copyright At the same time as the construction of the first phase project, the work related to the second phase project of 23,000tpy lithium chloride will be conducted.Asian Metal Copyright The government of Anju district in Suining signed an agreement with Tianqi Lithium on December 14th, 2017.Asian Metal Copyright The second phase project will have an investment of RMB800,000,000-1,000,000,000 based on the plan.


    .Asian Metal Copyright The first phase project will produce lithium carbonate, an important raw material to produce lithium ion battery, as well as anhydrous sodium sulfate, lithium-silicon powder, industrial gypsum and other by-productsAsian Metal Copyright
    Lithium Carbonate 99.2%min Delivered China
    Unit:RMB/mt
    Lithium Carbonate 99.2%min Delivered China RMB/mt
    China lithium carbonate 99.5%mi producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.