• Copper Cathode 99.99%min Delivered China(4300)  05-20|Copper Conc. 20%min Delivered China(4000)  05-20|Copper Scrap Wire 99%min Delivered China(4000)  05-20|Copper Conc. TC 25%min CIF China(-1)  05-20|Antimony Ingot 99.65%min EXW China(4500)  05-20|Antimony Ingot 99.85%min EXW China(4500)  05-20|Antimony Conc. 50%min Delivered China(3500)  05-20|Antimony Trioxide 99.5%min Delivered China(3500)  05-20|Antimony Trioxide 99.8%min Delivered China(3500)  05-20|Tin Conc. Burmese 20%min In warehouse MengA(7000)  05-20|Indium Ingot 99.995%min Delivered US(8)  05-20|Nickel Cathode 99.96%min EXW China(4500)  05-20|Nickel Cathode Norilsk 99.96%min In port China(4400)  05-20|Tin Conc. Burmese 30%min In warehouse MengA(7000)  05-20
  • LG Chem's battery project settled in Nanjing

    2018-07-18 17:21:40   [Print]
    On July 17th, LG Chem signed an agreement on its chemical power battery project with a total investment of USD2 billion in Binjiang development zone of Nanjing.Asian Metal CopyrightOn July 17th, LG Chem signed an agreement on its chemical power battery project with a total investment of USD2 billion in Binjiang development zone of Nanjing.Asian Metal Copyright The company expects to commence the construction in October, realize mass production from October 2019, and reach the designed capacity in 2023.


    .Asian Metal Copyright Asian Metal Copyright
    Lithium Hydroxide Monohydrate LiOH 56.5%min Delivered China
    Unit:RMB/mt
    China lithium carbonate 99%min producers' output statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.