• Ferro-tungsten 75%min FOB Chinaup(2)  09-05|Ferro-tungsten 75%min In warehouse Rotterdamup(2)  09-05|Holmium Oxide 99.5%min EXW Chinaup(15)  09-05|Ferro-holmium 80% EXW Chinaup(15)  09-05|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinadown(-15000)  09-05|Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinaup(2)  09-05|Sodium Tungstate WO3 68%min EXW Chinaup(7000)  09-05|Erbium Oxide 99.5%min EXW Chinaup(8)  09-05|Tungsten Bar W-4 99.9%min FOB Chinaup(2)  09-05|Tungsten Ore WO3 50%min FOB Africaup(10)  09-05|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinaup(100)  09-05|Polysilicon 9N Delivered Chinaup(1)  09-05|PrNd Mischmetal Pr 25%, Nd 75% EXW Chinadown(-15000)  09-05|HR Coil IS2062 3.0mm In warehouse Mumbaidown(-1000)  09-05
  • Brunp Indonesia puts four electric furnaces into commercial production

    2021-03-16 15:52:13   [Print]
    On March 13, 2021, Guangdong Brunp Recycling Technology Co.Asian Metal Copyright The Langit Metal project is located in Indonesia's Weda Bay Industrial Park.Asian Metal Copyright, Ltd.Asian Metal Copyright Since then, all four RKEF production lines were put into commercial operation, marking the new milestone of Brunp's gains in the layout and project construction of Indonesian nickel resources.Asian Metal Copyright (the company) successfully ignited the last electric furnace of Indonesia Langit Metal Co.Asian Metal Copyright, invested by the company.Asian Metal Copyright, Ltd.Asian Metal Copyright .Asian Metal Copyright, invested by the company.Asian Metal Copyright the company successfully ignited the last electric furnace of Indonesia Langit Metal Co.Asian Metal Copyright Since then, all four RKEF production lines were put into commercial operation, marking the new milestone of Brunp's gains in the layout and project construction of Indonesian nickel resources.

    The Langit Metal project is located in Indonesia's Weda Bay Industrial Park. The first phase of the project built four RKEF production lines, and the second phase will build ferronickel vulcanization and deep processing production lines.Asian Metal Copyright After the project reaches its maximum output, it can achieve an annual output of 36,000 tons equivalent of nickel metal, and annual sales income of more than RMB3 billion USD0.Asian Metal Copyright After the project reaches its maximum output, it can achieve an annual output of 36,000 tons equivalent of nickel metal, and annual sales income of more than RMB3 billion (USD0.Asian Metal Copyright46 billion.Asian Metal Copyright46 billion).
    .Asian Metal Copyright, invested by the companyAsian Metal Copyright
    Nickel Ore Philippine 1.5%min CIF China
    Unit:USD/mt
    Nickel Ore Philippine 1.5%min CIF China USD/mt
    China ferronickel producers' sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.