• Tungsten Ore WO3 50%min FOB Africadown(-60)  11-17|Lithium Cobaltate Co 60%min Delivered Chinaup(7)  11-17|Tungsten APT 88.5%min IW Rotterdamdown(-75)  11-17|Germanium Dioxide 99.99%min FOB Chinaup(80)  11-17|Cobalt Sulfate 20.5%min Delivered Chinaup(1300)  11-17|Ytterbium Oxide 99.99%min EXW Chinaup(5)  11-17|Cobalt Oxide 72%min Delivered Chinaup(5)  11-17|Cobalt Powder 99.5%min Delivered Chinaup(8)  11-17|Germanium Metal 99.99%min FOB Chinaup(130)  11-17|Cobalt Tetroxide 73.5%min Delivered Chinaup(5)  11-17|LNCMO 8312 PC Delivered Chinadown(-4)  11-17|Antimony Trioxide 99.5%min IW Baltimoredown(-0.2)  11-17|Samarium Cobalt 30H EXW Chinaup(5)  11-17|Molybdenum Scrap Wire 99.95%min Ex-VAT EXW Chinaup(10)  11-17
  • South Manganese signs MOU for manganese deep-processing project in Gabon

    2026-11-16 11:17:25   [Print]
    On November 6, South Manganese Investment Limited signed a Memorandum of Understanding (MOU) with Gabon's Ministry of Commerce, Industry, and Local Processing for a manganese ore deep-processing project.Asian Metal Copyright Located in the M'Bembele manganese mining area in Njole, Moyen-Ogooué Province, Gabon, Phase I of the project will feature a production line with an annual capacity of 180,000 tonnes of dephosphorized manganese-silicon lump ore, scheduled for commissioning in November 2028.Asian Metal Copyright This marks the official entry of the M'Bembele project--with a total investment of approximately 116.Asian Metal CopyrightOn November 6, South Manganese Investment Limited signed a Memorandum of Understanding MOU with Gabon's Ministry of Commerce, Industry, and Local Processing for a manganese ore deep-processing project.Asian Metal Copyright7 billion Central African CFA francs--into the substantive advancement phase.

    Located in the M'Bembele manganese mining area in Njole, Moyen-Ogooué Province, Gabon, Phase I of the project will feature a production line with an annual capacity of 180,000 tonnes of dephosphorized manganese-silicon lump ore, scheduled for commissioning in November 2028. It will be accompanied by comprehensive infrastructure for ore beneficiation, energy supply, and logistics transshipment.

    As Phase I operations mature and Gabon's local industrial supporting facilities improve, the total production capacity is slated to gradually expand to 1.08 million tonnes starting from 2030.


    .Asian Metal Copyright It will be accompanied by comprehensive infrastructure for ore beneficiation, energy supply, and logistics transshipmentAsian Metal Copyright
    Manganese Ore Gabonese 44%min In Tianjin Port
    Unit:RMB/dmtu
    Manganese Ore Gabonese 44%min In Tianjin Port RMB/dmtu
    China's manganese lump producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.