• Tungsten Ore WO3 50%min FOB Africadown(-60)  11-11|Mercury Metal 99.9%min Ex-VAT EXW Chinadown(-60)  11-11|Cobalt Oxide 72%min Delivered Chinaup(5)  11-11|Cobalt Metal 99.8%min Delivered Chinaup(7)  11-11|Germanium Dioxide 99.99%min FOB Chinaup(80)  11-11|Cobalt Tetroxide 73.5%min Delivered Chinaup(5)  11-11|Cobalt Sulfate 20.5%min Delivered Chinaup(1200)  11-11|Mercury Metal 99.999%min Ex-VAT EXW Chinadown(-60)  11-11|Cobalt Metal 99.8%min IW Rotterdamdown(-0.5)  11-11|Aluminum Ingot 99.7%min IW Foshandown(-620)  11-11|Lithium Metal 99%min Delivered Chinadown(-20000)  11-11|Ilmenite Conc 46%min Ex-VAT EXW Chinadown(-30)  11-11|Spodumene Li2O 5%min In port Chinadown(-40)  11-11|Spodumene Li2O 3%min In port Chinadown(-30)  11-11
  • Endeavour Silver announces first three quarters' lead-zinc output

    2026-11-11 10:56:41   [Print]
    Recently, Endeavour Silver released the production results for the third quarter of this year and the cumulative production so far.Asian Metal CopyrightRecently, Endeavour Silver released the production results for the third quarter of this year and the cumulative production so far.Asian Metal Copyright During the first three quarters, driven by the capacity expansion of its Kolpa silver-pb-zn polymetallic mine processing plant to 2,500 tons per day, the cumulative lead output increased by 93% year-on-year to 17,650 tons compared to 9,167 tons in the same period last year (with 6,504 tons of lead produced in Q3, a 15% increase year-on-year); the cumulative zinc output for the first three quarters was 11,389 tons, a 90% increase year-on-year compared to 5,982 tons in the same period last year (with 4,558 tons of zinc produced in Q3, a 24% increase year-on-year).
    .Asian Metal Copyright During the first three quarters, driven by the capacity expansion of its Kolpa silver-pb-zn polymetallic mine processing plant to 2,500 tons per day, the cumulative lead output increased by 93% year-on-year to 17,650 tons compared to 9,167 tons in the same period last year with 6,504 tons of lead produced in Q3, a 15% increase year-on-year; the cumulative zinc output for the first three quarters was 11,389 tons, a 90% increase year-on-year compared to 5,982 tons in the same period last year with 4,558 tons of zinc produced in Q3, a 24% increase year-on-yearAsian Metal Copyright
    Lead Conc. Pb 50%min, Ag 3,000g/dt max EXW China TC
    Unit:RMB/mmt
    Lead Conc. Pb 50%min, Ag 3,000g/dt max EXW China TC RMB/mmt
    China primary lead producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.