• Tungsten Ore WO3 55%min EXW Chinaup(10000)  10-28|Silico-manganese 60/14 FOB Indiaup(25)  10-28|Chromium Metal 99%min FOB Chinadown(-300)  10-28|Cobalt Tetroxide 73.5%min Delivered Chinadown(-5)  10-28|Tungsten Carbide 99.8%min 2.5-7.0μm EXW Chinaup(20)  10-28|Chrome Conc. S.A. 40%min CIF Chinadown(-7)  10-28|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinaup(20)  10-28|Silico-manganese 65/17 FOB Indiaup(25)  10-28|Nickel Ore Philippine 1.5%min CIF Chinadown(-1.5)  10-28|Chrome Conc. S.A. 42%min CIF Chinadown(-7)  10-28|Spodumene Li2O 5%min In port Chinadown(-50)  10-28|Cobalt Oxide 72%min Delivered Chinadown(-4)  10-28|Bismuth Ingot 99.99%min Delivered Indiaup(60)  10-28|Cobalt Metal 99.8%min IW Rotterdamdown(-0.5)  10-28
  • Capstone to invest $3B in Chile to double copper production

    2026-10-28 11:23:57   [Print]
    Capstone Copper will invest $3 billion in Chile's Atacama region to double its copper production in the country by 2031, according to the country's mining ministry.

    The investment includes $2.3 billion for the Santo Domingo copper project, which is in the early stages of construction, and about $220 million for two expansion projects at the nearby Mantoverde mine.

    The Canadian miner plans to share infrastructure and operations between Santo Domingo and Mantoverde, located about 35 km apart, to improve efficiency and reduce development and operating costs as it expands copper production in Chile.

    The project accounts for the largest share of the company's planned investment, making its development central to achieving the targeted production increase by 2031.

    At Mantoverde, Capstone is advancing two near-term projects with combined investments of about $220 million to increase copper output and potentially introduce cobalt production.

    The $176-million Optimized Mantoverde project, already under construction, is expected to add 20,000 tonnes of copper annually to the mine's current production of approximately 95,000 tonnes.

    A separate $45-million pyrite expansion is designed to contribute another 3,500 tonnes of copper per year while creating the potential to produce cobalt. Completion is scheduled for early 2028.

    Together, the two projects could lift Mantoverde's annual copper output to approximately 118,500 tonnes, an increase of nearly 25% from current levels, as Capstone advances its broader growth strategy in Chile.

    .Asian Metal Copyright The investment includes $2Asian Metal Copyright
    Blister Copper 98.5%min Delivered China RC
    Unit:RMB/mt
    Blister Copper 98.5%min Delivered China RC RMB/mt
    China's copper rod producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.