Jintong Copper puts phase II project into operation
2026-10-13 10:39:17 [Print]
The phase II project of Jintong Copper, in which Tongling Nonferrous Metals Group holds a stake, was put into operation recently.
Located in Chifeng City, Inner Mongolia Autonomous Region, the project involves a total investment of RMB4 billion (USD597.49 million). It adopts a domestically developed continuous converting process featuring "oxygen-enriched side-blown smelting + multi-lance top-blown converting + rotary anode refining," with a designed copper cathode capacity of 300,000tpy.
Upon reaching full production, the company will have production capacities of 550,000tpy of copper cathode and 2,000,000tpy of sulfuric acid.
Located in Chifeng City, Inner Mongolia Autonomous Region, the project involves a total investment of RMB4 billion (USD597.49 million). It adopts a domestically developed continuous converting process featuring "oxygen-enriched side-blown smelting + multi-lance top-blown converting + rotary anode refining," with a designed copper cathode capacity of 300,000tpy.
Upon reaching full production, the company will have production capacities of 550,000tpy of copper cathode and 2,000,000tpy of sulfuric acid.

