• Silicon Carbide Black 88%min 0-10mm EXW Chinaup(150)  09-22|Iron Ore Fine 65%min EXW Liaoningdown(-25)  09-22|Magnesia D.B. 90%min 0-3mm EXW Chinaup(30)  09-22|Iron Ore Fine 65%min EXW Shandongdown(-27)  09-22|Iron Ore Fine Australian 58%min In port Chinadown(-20)  09-22|Magnesia C.C. 85%min 200mesh EXW Chinaup(30)  09-22|Silicon Carbide Black 88%min 1-10mm EXW Chinaup(150)  09-22|Iron Ore Fine 65%min Ex-VAT EXW Shanxidown(-20)  09-22|Coal Tar Pitch Coking Value 56%min EXW Chinaup(200)  09-22|Tungsten Ore WO3 55%min EXW Chinadown(-10000)  09-22|Iron Ore Fine Australian 62%min In port Chinadown(-20)  09-22|Silicon Carbide Black 88%min 0-10mm FOB Chinaup(20)  09-22|Antimony Trioxide 99.5%min Delivered Chinadown(-2000)  09-22|Silicon Carbide Black 88%min 1-10mm FOB Chinaup(20)  09-22
  • Capstone Copper to sell Mexican mine to Luca Mining for $385M

    2026-09-22 11:14:55   [Print]
    Capstone Copper is selling its Cozamin copper-silver-zinc-lead mine in Mexico to Luca Mining for up to $385 million as it redirects capital toward larger copper growth projects in Chile and the US.

    The deal announced Monday includes $275 million in cash at closing and $15 million in Luca shares, plus $35 million in deferred consideration and as much as $60 million in payments linked to future copper prices. The transaction is expected to close in the fourth quarter, subject to regulatory approvals and other customary conditions.

    For Luca, Cozamin adds a third producing Mexican mine to a portfolio that includes the Campo Morado polymetallic operation in Guerrero state and the Tahuehueto gold-silver mine in Durango state. Luca said Cozamin is expected to more than double its 2027 production profile based on current consensus estimates while increasing its exposure to copper and silver.

    Cozamin, in Zacatecas state, has operated continuously under Capstone since late 2006, when commercial production began at 1,000 tonnes per day. The mine had three years of reserves at the time, but exploration subsequently extended its mine life to 2030.

    From 2023 through 2030, Cozamin was forecast to produce an average of 20,000 tonnes of copper and 1.3 million oz.Asian Metal Copyright The transaction is expected to close in the fourth quarter, subject to regulatory approvals and other customary conditions.Asian Metal Copyright of silver annually at C1 costs of $1.Asian Metal Copyright of copper.Asian Metal Copyright51 per payable lb.Asian Metal Copyright Luca plans an extensive resource validation and exploration program after closing aimed at extending Cozamin's mine life and demonstrating its longer-term cash-flow potential.Asian Metal Copyright of copper.Asian Metal Copyright51 per payable lb.Asian Metal Copyright Production was projected to average 24,000 tonnes of copper and 1.Asian Metal Copyright3 million oz.Asian Metal Copyright7 million oz.Asian Metal Copyright The transaction is expected to close in the fourth quarter, subject to regulatory approvals and other customary conditions.Asian Metal Copyright of silver annually from 2023 through 2027, at C1 costs of $1.Asian Metal Copyright From 2023 through 2030, Cozamin was forecast to produce an average of 20,000 tonnes of copper and 1.Asian Metal Copyright46 per payable lb.

    Luca plans an extensive resource validation and exploration program after closing aimed at extending Cozamin's mine life and demonstrating its longer-term cash-flow potential.

    .Asian Metal Copyright of silver annually from 2023 through 2027, at C1 costs of $1Asian Metal Copyright
    Lead Conc. Pb 50%min, Ag 700g/dt min EXW China Ag payable
    Unit:%
    Lead Conc. Pb 50%min, Ag 700g/dt min EXW China Ag payable %
    China primary lead producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.