• Zinc Ingot 99.995%min IW Tianjindown(-820)  09-11|Zinc Ingot 99.995%min IW Guangzhoudown(-820)  09-11|Zinc Ingot 99.995%min IW Shanghaidown(-820)  09-11|Copper Cathode 99.99%min Delivered Chinadown(-3300)  09-11|Zinc Die-casting Alloy Zamak-3 EXW Chinadown(-820)  09-11|Copper Conc. 20%min Delivered Chinadown(-3200)  09-11|Zinc Die-casting Alloy Zamak-5 EXW Chinadown(-820)  09-11|Ferro-tungsten 75%min IW Rotterdamdown(-5)  09-11|Cobalt Intermediate 30-40% CIF Chinadown(-0.5)  09-11|Ilmenite Conc 52%min CIF Chinadown(-5)  09-11|Zinc Powder 96%min 325mesh EXW Chinadown(-820)  09-11|Met. Coke A 13%max, S 0.7%max EXW Shanxiup(60)  09-11|Met. Coke A 13%max, S 0.7%max EXW Hebeiup(60)  09-11|Tin Conc. Burmese 20%min IW MengAdown(-10000)  09-11
  • Trekor advances Aley Niobium Project toward commercial production

    2026-08-24 11:46:29   [Print]
    Trekor Metals is reporting significant progress at its Aley niobium project, located in northeastern British Columbia.Asian Metal Copyright With a planned milling capacity of 10,000 tonnes per day, the project is expected to produce approximately 14,000 tonnes of ferroniobium annually---equivalent to roughly nine million kilograms of niobium metal per year.Asian Metal Copyright The company has achieved notable improvements in ore processing, including higher recovery rates, enhanced concentrate grades, and reduced reagent consumption---all through the application of a proprietary flotation process.Asian Metal Copyright A technical report prepared in accordance with National Instrument 43-101 standards confirms that Aley holds proven and probable mineral reserves totaling 84 million tonnes, grading 0.Asian Metal Copyright These developments have also enabled the successful production of market-grade ferroniobium.

    The Aley project, a wholly-owned asset of Trekor Metals, is advancing toward its commercial phase. Alongside technical gains, the company is actively engaging with potential off-take partners to secure a stable market for its future niobium output.

    A technical report prepared in accordance with National Instrument 43-101 standards confirms that Aley holds proven and probable mineral reserves totaling 84 million tonnes, grading 0.50% Nb?O?.Asian Metal Copyright With a planned milling capacity of 10,000 tonnes per day, the project is expected to produce approximately 14,000 tonnes of ferroniobium annually---equivalent to roughly nine million kilograms of niobium metal per year.Asian Metal Copyright With a planned milling capacity of 10,000 tonnes per day, the project is expected to produce approximately 14,000 tonnes of ferroniobium annually---equivalent to roughly nine million kilograms of niobium metal per year.

    .Asian Metal Copyright These developments have also enabled the successful production of market-grade ferroniobiumAsian Metal Copyright
    Niobium Conc. Nb2O5 50%min, Ta2O5 5%min CIF China
    Unit:USD/lb Oxides
    Niobium Conc. Nb2O5 50%min, Ta2O5 5%min CIF China USD/lb Oxides
    China niobium oxide producers' sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.