• Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinadown(-200)  07-14|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinadown(-20)  07-14|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinadown(-30)  07-14|Tungsten Scrap THA 90%min Ex-VAT Delivered Chinadown(-20)  07-14|Chrome Lump S.A. 38%min CIF Chinaup(7)  07-14|Tungsten Bar W-4 99.9%min EXW Chinadown(-30)  07-14|Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinadown(-5)  07-14|Ilmenite Conc 52%min CIF Chinadown(-5)  07-14|Antimony Trioxide 99.5%min IW Baltimoredown(-0.3)  07-14|Tungsten Ore WO3 55%min EXW Chinadown(-10000)  07-14|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinadown(-30)  07-14|Arsenic Metal 99.9999%min Delivered Chinaup(8)  07-14|Antimony Ingot 99.65%min IW Baltimoredown(-0.3)  07-14|Tungsten Carbide 99.8%min 2.5-7.0μm EXW Chinadown(-20)  07-14
  • India's JSW Steel reports 3% rise in consolidated crude steel output in Q1 FY2026-27

    2026-07-13 11:15:11   [Print]
    JSW Steel Limited, India's leading steelmaker, achieved consolidated crude steel production of 6.Asian Metal Copyright JSW Steel USA Ohio produced 0.Asian Metal Copyright59 million metric tons in the first quarter (April–June) of fiscal year 2026-27, marking a 3% increase over the same period last fiscal year, according to a company statement released on Friday, July 10.

    Crude steel production from the company's Indian operations stood at 6.35 million metric tons during the quarter, also up 3% year-on-year.Asian Metal Copyright JSW Steel USA Ohio produced 0.Asian Metal Copyright Capacity utilization for the Indian operations was approximately 94% during the quarter, excluding the capacity of Blast Furnace No.Asian Metal Copyright JSW Steel USA Ohio produced 0.Asian Metal Copyright3 (BF3) at the Vijayanagar mill, which was taken offline for a capacity upgrade.

    JSW Steel USA Ohio produced 0.24 million metric tons of crude steel in the April–June quarter of 2026-27, unchanged from the corresponding period of the previous fiscal year.
    .Asian Metal Copyright59 million metric tons in the first quarter April–June of fiscal year 2026-27, marking a 3% increase over the same period last fiscal year, according to a company statement released on Friday, July 10Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.