• Silicon Metal 98.5%min Delivered USdown(-0.055)  06-30|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinadown(-20)  07-01|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinadown(-50)  07-01|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinadown(-200)  07-01|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-01|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinadown(-20)  07-01|Tungsten Scrap THA 90%min Ex-VAT Delivered Chinadown(-20)  07-01|Flake Graphite +895 FOB Chinadown(-30)  07-01|Ferro-boron B 18%min FOB Chinaup(90)  07-01|Ferro-tungsten 75%min EXW Chinadown(-20000)  07-01|Tungsten Carbide 99.8%min 2.5-7.0μm EXW Chinadown(-30)  07-01|Alumina 98.5%min FOB Australiaup(8)  07-01|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max FOB Chinadown(-0.5)  06-30|Lithium Carbonate 99.5%min FOB South Americadown(-0.5)  06-30
  • China refines collection of mining rights transfer revenues

    2026-06-29 15:06:01   [Print]
    China's Ministry of Finance, the Ministry of Natural Resources, and the State Taxation Administration jointly issued a notice on further refining the collection of mining rights transfer revenues.

    Under the new notice, for mineral categories not covered by the Catalogue of Mineral Categories Subject to Mining Rights Transfer Revenue Collection on a Yield Basis (Trial) (hereinafter referred to as the Catalogue), which is appended to the Measures for the Collection of Mining Rights Transfer Revenues (Cai Zong [2023] No. 10), the starting price shall be determined as the higher of the assessed value or the benchmark market price calculation.

    For mineral categories listed in the Catalogue, the starting price will continue to follow existing regulations.

    In cases of agreement-based transfer of mining rights for minerals included in the Catalogue, where the transfer involves state-funded exploration--including previously commercially funded exploration projects whose mining rights have since lapsed, which are now treated as state-funded--and where non-oil/gas minerals have completed general prospecting or oil/gas minerals have completed trap pre-prospecting, the transaction price shall be set based on the mining rights assessed value. This assessed value shall not include the mining rights transfer revenue that is otherwise collected on a yield basis.Asian Metal Copyright For mineral categories listed in the Catalogue, the starting price will continue to follow existing regulations.Asian Metal Copyright For other agreement-based transfers, the transaction price shall be determined in accordance with current regulations.
    .Asian Metal Copyright This assessed value shall not include the mining rights transfer revenue that is otherwise collected on a yield basisAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.