• Ferro-tungsten 70%min EXW Chinaup(20000)  06-01|Ferro-gadolinium 73% EXW Chinadown(-6000)  06-01|Coking Coal A 10.5%max, S 0.8%max EXW Shanxiup(50)  06-01|Germanium Dioxide 99.99%min FOB Chinaup(70)  06-01|Ferro-tungsten 75%min FOB Chinaup(5)  06-01|Met. Coke A 13%max, S 0.7%max EXW Shanxiup(50)  06-01|Met. Coke A 13%max, S 0.7%max EXW Hebeiup(50)  06-01|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinaup(15)  06-01|Gadolinium Oxide 99.5%min EXW Chinadown(-6000)  06-01|Tungsten Oxide WO3 99.95%min EXW Chinaup(20000)  06-01|Ferro-tungsten 75%min EXW Chinaup(20000)  06-01|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinaup(170)  06-01|Germanium Metal 99.99%min FOB Chinaup(100)  06-01|Lanthanum Oxide 99.9%min EXW Chinaup(150)  06-01
  • KINGS Resources suspends operations and launches self-inspections at some mines

    2026-06-01 16:30:33   [Print]
    China KINGS Resources Group Co.Asian Metal Copyright Zhejiang Dajinzhuang Mining Industry Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright announced that competent mining and emergency management authorities will conduct rigorous round-by-round inspections and reviews on all underground mines across Zhejiang Province.Asian Metal Copyright By contrast, the ore dressing and chemical integration project in Baotou maintains normal production of fluorite powder and anhydrous hydrogen fluoride, with its full-year production plan unchanged.Asian Metal Copyright To cooperate with the regulatory work, the company's underground mines in Zhejiang have either undergone official inspections, suspended production for internal checks or awaited follow-up reviews and acceptance.

    Zhejiang Dajinzhuang Mining Industry Co., Ltd.Asian Metal Copyright Zhejiang Dajinzhuang Mining Industry Co.Asian Metal Copyright, a subsidiary of the group, received a written notice from local emergency management authorities.Asian Metal Copyright The company originally targeted an annual output of 400,000 to 450,000 tons of various fluorite products from its individual fluorite mines in 2026.Asian Metal Copyright The mine is required to rectify potential safety hazards before June 15, 2026, and must halt all production activities until the rectification passes acceptance.

    Zhejiang Suichang Zhengzhong Fluorite Picking Co., Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright has completed the preliminary official review.Asian Metal Copyright Zhejiang Suichang Zhengzhong Fluorite Picking Co.Asian Metal Copyright It plans to submit a work resumption application soon and will restart operations upon approval.

    Other Zhejiang-based mines, namely Zhejiang Changshan Jinshi Mining Co., Ltd.Asian Metal CopyrightChina KINGS Resources Group Co.Asian Metal Copyright, Longquan Fluorspar Co.Asian Metal Copyright The mine is required to rectify potential safety hazards before June 15, 2026, and must halt all production activities until the rectification passes acceptance.Asian Metal Copyright, Ltd.Asian Metal Copyright and Zhejiang Lanxi Jinchang Mining Co.Asian Metal Copyright and Zhejiang Lanxi Jinchang Mining Co.Asian Metal Copyright The affected Zhejiang mines register a monthly output of around 30,000 tons.Asian Metal Copyright, Ltd.Asian Metal Copyright The company originally targeted an annual output of 400,000 to 450,000 tons of various fluorite products from its individual fluorite mines in 2026.Asian Metal Copyright, have suspended operations to carry out self-examination and rectification as required.Asian Metal Copyright The company originally targeted an annual output of 400,000 to 450,000 tons of various fluorite products from its individual fluorite mines in 2026.Asian Metal Copyright They are pending individual reviews, acceptance or further rectification instructions from emergency management authorities.

    The company originally targeted an annual output of 400,000 to 450,000 tons of various fluorite products from its individual fluorite mines in 2026. The affected Zhejiang mines register a monthly output of around 30,000 tons.Asian Metal Copyright By contrast, the ore dressing and chemical integration project in Baotou maintains normal production of fluorite powder and anhydrous hydrogen fluoride, with its full-year production plan unchanged.Asian Metal Copyright By contrast, the ore dressing and chemical integration project in Baotou maintains normal production of fluorite powder and anhydrous hydrogen fluoride, with its full-year production plan unchanged.
    .Asian Metal Copyright The mine is required to rectify potential safety hazards before June 15, 2026, and must halt all production activities until the rectification passes acceptanceAsian Metal Copyright
    Fluorspar 97%min Delivered China
    Unit:RMB/mt
    Fluorspar 97%min Delivered China RMB/mt
    China reductive calcium clump producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.