• Zinc Conc. 50%min CIF China TCdown(-5)  07-10|Lead Conc. 50%min CIF China TCdown(-10)  07-10|Antimony Trioxide 99.5%min IW Baltimoredown(-0.5)  07-10|Lithium Carbonate 99.2%min Delivered Chinadown(-5000)  07-10|Lithium Carbonate 99.5%min Delivered Chinadown(-5000)  07-10|Tungsten APT 88.5%min EXW Chinadown(-20000)  07-10|Sodium Pyroantimonate 58.4% Delivered Chinadown(-1500)  07-10|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinadown(-30)  07-10|Ferro-tungsten 75%min EXW Chinadown(-20000)  07-10|Tungsten Oxide WO3 99.95%min EXW Chinadown(-20000)  07-10|Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinadown(-5)  07-10|Ethylene Glycol Antimony 57%min Delivered Chinadown(-2000)  07-10|Calcium Granule Reductive 98%min FOB Chinaup(80)  07-10|Calcium Ingot Reductive 98%min EXW Chinaup(500)  07-10
  • Chating copper polymetallic ore exploration completed

    2026-05-27 17:24:12   [Print]
    The Chating copper polymetallic ore exploration project has finished all drilling works ahead of time.Asian Metal Copyright The mining area covers 10.Asian Metal Copyright The whole task took merely four months, achieving zero safety incidents and pollution-free green exploration.

    Previously, Tibet Yulong Copper Industry Co., Ltd.Asian Metal Copyright, acquired the exploration right of the Chating deposit via bidding.Asian Metal Copyright, a subsidiary of Western Mining Co.Asian Metal Copyright Previously, Tibet Yulong Copper Industry Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, acquired the exploration right of the Chating deposit via bidding.Asian Metal Copyright, acquired the exploration right of the Chating deposit via bidding.Asian Metal Copyright Previously, Tibet Yulong Copper Industry Co.Asian Metal Copyright The mining area covers 10.Asian Metal Copyright The mining area covers 10.Asian Metal Copyright447 square kilometers, targeting copper, gold, silver, lead, zinc and sulfur.

    The exploration was designed to reach full exploration standards in one go. With a total planned investment of RMB150 million (USD22.Asian Metal Copyright13 million, the project includes 71 boreholes for the initial mining zone with a total drilling footage of 100,090 meters and a maximum depth of 2,000 meters.Asian Metal Copyright13 million), the project includes 71 boreholes for the initial mining zone with a total drilling footage of 100,090 meters and a maximum depth of 2,000 meters.Asian Metal Copyright With a total planned investment of RMB150 million USD22.Asian Metal Copyright High-power 3D induced polarization geophysical survey was conducted across the entire area to assess mineral prospects in the periphery and deep parts of the deposit, alongside other geological surveys.
    .Asian Metal CopyrightThe Chating copper polymetallic ore exploration project has finished all drilling works ahead of timeAsian Metal Copyright
    Copper Conc. 20%min Delivered China
    Unit:RMB/mmt
    Copper Conc. 20%min Delivered China RMB/mmt
    China's copper rod producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.