• Zinc Conc. 50%min CIF China TCdown(-5)  05-18|Tungsten Ore WO3 55%min EXW Chinadown(-50000)  05-18|Copper Conc. 25%min CIF China TCdown(-5)  05-18|Tungsten APT 88.5%min EXW Chinadown(-50000)  05-18|Tungsten Oxide WO3 99.95%min EXW Chinadown(-50000)  05-18|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinadown(-100)  05-18|Ferro-tungsten 70%min EXW Chinadown(-40000)  05-18|Ferro-tungsten 75%min EXW Chinadown(-40000)  05-18|Tungsten Carbide 99.8%min 2.5-7.0μm EXW Chinadown(-60)  05-18|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinadown(-60)  05-18|Tungsten APT 88.5%min FOB Chinadown(-70)  05-18|Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinadown(-10)  05-18|Tungsten Oxide WO3 99.95%min FOB Chinadown(-70)  05-18|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinadown(-250)  05-18
  • Julin New Materials to develop phosphate mining project

    2026-05-18 16:37:44   [Print]
    Yunnan Yuntianhua Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright recently announced that its subsidiary, Yunnan Yuntianhua Julin New Materials Co.Asian Metal Copyright, plans to invest in a phosphate mining project with an annual capacity of 10 million tonnes.Asian Metal Copyright, Ltd.Asian Metal Copyright Construction is expected to begin in December 2026, with an estimated development period of five years.Asian Metal Copyright, plans to invest in a phosphate mining project with an annual capacity of 10 million tonnes.Asian Metal Copyright, plans to invest in a phosphate mining project with an annual capacity of 10 million tonnes.Asian Metal Copyright The total investment is estimated at RMB8.Asian Metal Copyright44 billion tonnes, with an average phosphate ore grade of 22.Asian Metal Copyright17 billion (USD1.Asian Metal Copyright The project has been designated as one of Yunnan Province's first batch of major projects for 2026.Asian Metal Copyright20 billion).Asian Metal Copyright20 billion.Asian Metal Copyright Construction is expected to begin in December 2026, with an estimated development period of five years.

    Julin New Materials secured the mining rights for the Wanchang phosphate mine in Zhenxiong County, Yunnan Province in December 2025. As of February 2025, the mining area had identified total resources of 2.Asian Metal Copyright It is expected to leverage local resource advantages to drive high-quality industrial development.Asian Metal Copyright44 billion tonnes, with an average phosphate ore grade of 22.Asian Metal Copyright, plans to invest in a phosphate mining project with an annual capacity of 10 million tonnes.Asian Metal Copyright54%.

    The project has been designated as one of Yunnan Province's first batch of major projects for 2026. It is expected to leverage local resource advantages to drive high-quality industrial development.
    .Asian Metal Copyright, LtdAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.