• Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinadown(-1500)  05-25|Tungsten Scrap THA 90%min Ex-VAT Delivered Chinadown(-150)  05-25|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinadown(-100)  05-25|Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinadown(-30)  05-25|Tungsten Bar W-4 99.9%min FOB Chinadown(-30)  05-25|Tungsten Carbide 99.8%min 2.5-7.0μm EXW Chinadown(-150)  05-25|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinadown(-150)  05-25|Ferro-tungsten 75%min FOB Chinadown(-20)  05-25|Ferro-vanadium 80%min IW Pittsburghdown(-4)  05-25|Sodium Tungstate WO3 68%min EXW Chinadown(-50000)  05-25|Tungsten Bar W-4 99.9%min EXW Chinadown(-100)  05-25|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinadown(-100)  05-25|Tungsten Oxide WO3 99.95%min FOB Chinadown(-100)  05-25|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinadown(-30)  05-25
  • Major Chinese steel mills' daily finished steel output up further in late Mar

    2026-04-07 14:43:28   [Print]
    Major Chinese steel mills produced around 22.Asian Metal CopyrightMajor Chinese steel mills produced around 22.Asian Metal Copyright64 million tonnes of finished steel during the final eleven days of March, with the daily average output of 2,058,000 tonnes, up 3.Asian Metal CopyrightMajor Chinese steel mills produced around 22.Asian Metal Copyright8% from mid-March, according to China Iron & Steel Association (CISA).

    By the end of the period, finished steel inventories at major mills were 16.55 million tonnes, a decrease of 1.Asian Metal Copyright .Asian Metal Copyright36 million tonnes, or 7.Asian Metal Copyright55 million tonnes, a decrease of 1.Asian Metal Copyright6%, from mid-March.


    .Asian Metal Copyright By the end of the period, finished steel inventories at major mills were 16Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.