• Tungsten APT 88.5%min IW Rotterdamup(70)  04-09|Manganese Ore S.A. 36%min In Qinzhou Portdown(-1)  04-09|Manganese Ore S.A. 37%min In Qinzhou Portdown(-1)  04-09|Cerium Oxide 99%min FOB Chinaup(50)  04-09|Ferro-gadolinium 73% EXW Chinaup(5000)  04-09|Manganese Ore S.A. 36%min In Tianjin Portdown(-1)  04-09|Titanium Dioxide Rutile, 93%min FOB Chinaup(50)  04-09|Manganese Ore S.A. 37%min In Tianjin Portdown(-1)  04-09|Gadolinium Oxide 99.5%min EXW Chinaup(5000)  04-09|Rebar BS4449 GR500 16mm IW Kuala Lumpurup(50)  04-09|Wire Rod SAE1008 5.5mm IW Kuala Lumpurup(50)  04-09|HR Coil SS400 3.0mm IW Kuala Lumpurup(50)  04-09|Ilmenite Conc 52%min CIF Chinadown(-5)  04-09|Lanthanum Chloride 99.9%min EXW Chinaup(50)  04-09
  • Dushi Group to build 300ktpa prebaked anode project in Hinggan League

    2026-02-02 15:05:47   [Print]
    On January 30, Dushi Group signed an agreement to build a 300,000-tonne-per-annum prebaked anode project in Horqin Right Middle Banner of Hinggan League, Inner Mongolia, further expanding its carbon materials business.Asian Metal Copyright The project will integrate industrial resources from Horqin Right Middle Banner and Holingol City, strengthening the "coal-power-aluminum+" industrial chain and supporting the development of regional industrial clusters and high-quality growth.Asian Metal Copyright The project is scheduled to enter full operation on November 19, 2026.

    The project will integrate industrial resources from Horqin Right Middle Banner and Holingol City, strengthening the "coal-power-aluminum+" industrial chain and supporting the development of regional industrial clusters and high-quality growth.

    .Asian Metal Copyright The project is scheduled to enter full operation on November 19, 2026Asian Metal Copyright
    Prebaked Anode S 3%max EXW China
    Unit:RMB/mt
    Prebaked Anode S 3%max EXW China RMB/mt
    China commercial prebaked anode producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.