• Lithium Iron Phosphate Li 3.9%min Delivered Chinaup(1750)  01-23|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(4600)  01-23|Spodumene Li2O 6%min CIF Chinaup(65)  01-23|Lithium Metal 99.9%min Delivered Chinaup(28000)  01-23|Mercury Metal 99.9%min Ex-VAT EXW Chinaup(45)  01-23|Spodumene Li2O 5%min In port Chinaup(75)  01-23|Lithium Metal 99%min Delivered Chinaup(26000)  01-23|Rebar CB400V/SD390 Φ14-32mm In warehouse Hanoiup(400000)  01-23|Indium Ingot 99.995%min EXW Chinaup(100)  01-23|Lithium Carbonate 99.5%min Delivered EUup(0.5)  01-23|Lithium Carbonate 99.5%min CIF Chinaup(0.5)  01-23|Spodumene Li2O 3%min In port Chinaup(60)  01-23|Mercury Metal 99.999%min Ex-VAT EXW Chinaup(45)  01-23|Lithium Carbonate 99.2%min Delivered Chinaup(4500)  01-23
  • Yulong Copper completes major ore-processing upgrade

    2025-12-02 16:05:15   [Print]
    Tibet Yulong Copper Co.Asian Metal Copyright After the upgrade, the project's annual processing capacity for oxidized copper ore would increase from 350,000 tonnes to 1 million tonnes, with copper leaching rate expected to exceed 67% and the overall recovery set to reach 65%, and the annual copper cathode output would rise from 4,058 tonnes to 13,527 tonnes.Asian Metal Copyright, Ltd.Asian Metal Copyright has completed and launched its upgrade project aimed at improving the treatment of complex, hard-to-process ores at Yulong Copper Mine in Qingnidong, Changdu.Asian Metal Copyright has completed and launched its upgrade project aimed at improving the treatment of complex, hard-to-process ores at Yulong Copper Mine in Qingnidong, Changdu.Asian Metal Copyright After the upgrade, the project's annual processing capacity for oxidized copper ore would increase from 350,000 tonnes to 1 million tonnes, with copper leaching rate expected to exceed 67% and the overall recovery set to reach 65%, and the annual copper cathode output would rise from 4,058 tonnes to 13,527 tonnes.Asian Metal Copyright The project involved replacing outdated facilities, building new workshops, upgrading processing systems, and improving supporting infrastructure.

    After the upgrade, the project's annual processing capacity for oxidized copper ore would increase from 350,000 tonnes to 1 million tonnes, with copper leaching rate expected to exceed 67% and the overall recovery set to reach 65%, and the annual copper cathode output would rise from 4,058 tonnes to 13,527 tonnes. This upgrade marks an important step forward in China's ability to process complex ores and adds new momentum to industrial development in eastern Tibet.

    .Asian Metal CopyrightTibet Yulong Copper CoAsian Metal Copyright
    Copper Conc. 20%min Delivered China
    Unit:RMB/mt Cu
    Copper Conc. 20%min Delivered China RMB/mt Cu
    China copper concentrate producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.