• Copper Conc. TC 25%min CIF Chinadown(-3)  07-04|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-04|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-50)  07-04|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-50)  07-04|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-100)  07-04|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(8)  07-04|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-04|Selenium Powder 99.9%min Delivered Indiaup(50)  07-04|Chrome Lump S.A. 38%min In port Chinadown(-1)  07-04|Silico-manganese 60/14 EXW Chinaup(100)  07-04|Silico-manganese 65/17 EXW Chinaup(100)  07-04|Rebar HRB400 20mm In warehouse Guangzhouup(50)  07-04|Flake Graphite +195 EXW Chinadown(-100)  07-04|Ferro-silicon 75%min In warehouse Rotterdamdown(-20)  07-04
  • POWERCHINA signs KEBO bauxite mining and transport contract in Guinea

    2025-07-04 15:57:43   [Print]
    Power Construction Corporation of China (POWERCHINA), through its subsidiary Sinohydro Corporation Limited, has signed a contract with Guinea Kebo Huaxing Mining Company and Huaxing Gaoke (Beijing) Business Development Co.Asian Metal Copyright The contract value is approximately RMB5.Asian Metal Copyright, Ltd.Asian Metal Copyright The total construction period is expected to be about 72 months, with no warranty period.Asian Metal Copyright for the KEBO bauxite mining and transportation project in Guinea.Asian Metal Copyright Scope of work includes bauxite exploration, overburden removal, waste stripping, mining, and transportation.Asian Metal Copyright The contract value is approximately RMB5.Asian Metal Copyright, Ltd.Asian Metal Copyright063 billion (USD707 million).

    The project is located in Madina Dian, Télimélé Province, Kindia Region, covering a mining area of about 204.37 square kilometers.Asian Metal Copyright063 billion USD707 million.Asian Metal Copyright Scope of work includes bauxite exploration, overburden removal, waste stripping, mining, and transportation.Asian Metal Copyright The project targets a total bauxite output of around 28 million tonnes, with an overland transportation distance of approximately 197 kilometers.Asian Metal Copyright The project targets a total bauxite output of around 28 million tonnes, with an overland transportation distance of approximately 197 kilometers.Asian Metal Copyright37 square kilometers.Asian Metal Copyright The total construction period is expected to be about 72 months, with no warranty period.

    .Asian Metal Copyright37 square kilometersAsian Metal Copyright
    Bauxite Malaysian 40%min CIF China
    Unit:USD/dt
    Bauxite Malaysian 40%min CIF China USD/dt
    Africa bauxite producers' inventory statistics by country by month
    Unit: 10,000mt
      Copyright © Asian Metal Ltd All rights reserved.