• Titanium Slag TiO2 90%min EXW Chinadown(-200)  07-15|Rhenium APR 99.99%min EXW Chinaup(250)  07-15|Titanium Dioxide R TiO2 93%min, Si/Zr Coating Delivered Chinadown(-400)  07-15|Cobalt Tetroxide 73.5%min Delivered Chinaup(5)  07-15|Cobalt Chloride 24%min Delivered Chinaup(1500)  07-15|Polysilicon 9N Delivered Chinaup(1)  07-15|Titanium Tetrachloride 99.99%min EXW Chinadown(-150)  07-15|Fluorspar 97%min Delivered Chinadown(-80)  07-15|Cobalt Carbonate 46%min Delivered Chinaup(3000)  07-15|Silicon Metal 97%min EXW Chinaup(200)  07-15|Titanium Dioxide R TiO2 93%min FOB Chinadown(-50)  07-15|Copper Conc. TC 25%min CIF Chinadown(-1)  07-15|Fused Alumina Brown 95%min 1-3mm In warehouse Rotterdamdown(-20)  07-15|Fused Alumina White 99%min 1-3mm In warehouse Rotterdamdown(-20)  07-15
  • POWERCHINA signs KEBO bauxite mining and transport contract in Guinea

    2025-07-04 15:57:43   [Print]
    Power Construction Corporation of China (POWERCHINA), through its subsidiary Sinohydro Corporation Limited, has signed a contract with Guinea Kebo Huaxing Mining Company and Huaxing Gaoke (Beijing) Business Development Co.Asian Metal Copyright The contract value is approximately RMB5.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright for the KEBO bauxite mining and transportation project in Guinea.Asian Metal CopyrightPower Construction Corporation of China POWERCHINA, through its subsidiary Sinohydro Corporation Limited, has signed a contract with Guinea Kebo Huaxing Mining Company and Huaxing Gaoke Beijing Business Development Co.Asian Metal Copyright The contract value is approximately RMB5.Asian Metal CopyrightPower Construction Corporation of China POWERCHINA, through its subsidiary Sinohydro Corporation Limited, has signed a contract with Guinea Kebo Huaxing Mining Company and Huaxing Gaoke Beijing Business Development Co.Asian Metal Copyright063 billion (USD707 million).

    The project is located in Madina Dian, Télimélé Province, Kindia Region, covering a mining area of about 204.37 square kilometers.Asian Metal Copyright, Ltd.Asian Metal Copyright Scope of work includes bauxite exploration, overburden removal, waste stripping, mining, and transportation.Asian Metal CopyrightPower Construction Corporation of China POWERCHINA, through its subsidiary Sinohydro Corporation Limited, has signed a contract with Guinea Kebo Huaxing Mining Company and Huaxing Gaoke Beijing Business Development Co.Asian Metal Copyright The project targets a total bauxite output of around 28 million tonnes, with an overland transportation distance of approximately 197 kilometers.Asian Metal Copyright The total construction period is expected to be about 72 months, with no warranty period.Asian Metal Copyright The total construction period is expected to be about 72 months, with no warranty period.

    .Asian Metal Copyright The project is located in Madina Dian, Télimélé Province, Kindia Region, covering a mining area of about 204Asian Metal Copyright
    Bauxite Malaysian 40%min CIF China
    Unit:USD/dt
    Bauxite Malaysian 40%min CIF China USD/dt
    China bauxite producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.