• Spodumene Li2O 6%min CIF Chinaup(25)  08-11|Lithium Carbonate 99.2%min Delivered Chinaup(2200)  08-11|Spodumene Li2O 3%min In port Chinaup(25)  08-11|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(2000)  08-11|Lithium Carbonate 99.5%min Delivered Chinaup(2200)  08-11|Lithium Iron Phosphate Li 3.9%min Delivered Chinaup(1000)  08-11|Spodumene Li2O 5%min In port Chinaup(30)  08-11|Ferro-phosphorus 23%min FOB Chinadown(-10)  08-11|Rhenium APR 99.99%min EXW Chinaup(300)  08-11|Tungsten Ore WO3 50%min FOB Africaup(10)  08-11|Samarium Cobalt 30H EXW Chinaup(6)  08-11|Yttrium Oxide 99.999%min In warehouse Rotterdamup(1.5)  08-11|Yttrium Oxide 99.999%min FOB Chinaup(0.3)  08-11|Ferro-tungsten 75%min FOB Chinaup(1.5)  08-11
  • Yulong copper mine phase III expansion gets green light

    2025-06-26 14:05:28   [Print]
    On June 23, Tibet Yulong Copper Co.Asian Metal Copyright The open-pit expansion includes a new 11-million-tonne-per-year concentrator, expansion of hydrometallurgical refining capacity from 300,000 tonnes to 1 million tonnes per year, and supporting infrastructure such as a new tailings storage facility.Asian Metal Copyright, Ltd.Asian Metal Copyright The upgraded mine, which mainly producescopper concentrate, molybdenum concentrate, and refined copper, will have a projected service life of 23 years, with an estimated total investment of RMB4.Asian Metal Copyright, a subsidiary of Western Mining, received approval from the Development and Reform Commission of Tibet Autonomous Region for its Phase III expansion project at the Yulong copper mine.Asian Metal Copyright, Ltd.Asian Metal Copyright The project will boost production capacity from 19.Asian Metal Copyright The upgraded mine, which mainly producescopper concentrate, molybdenum concentrate, and refined copper, will have a projected service life of 23 years, with an estimated total investment of RMB4.Asian Metal Copyright89 million to 30 million tonnes per year.

    The open-pit expansion includes a new 11-million-tonne-per-year concentrator, expansion of hydrometallurgical refining capacity from 300,000 tonnes to 1 million tonnes per year, and supporting infrastructure such as a new tailings storage facility. The upgraded mine, which mainly produces copper concentrate, molybdenum concentrate, and refined copper, will have a projected service life of 23 years, with an estimated total investment of RMB4.Asian Metal Copyright The open-pit expansion includes a new 11-million-tonne-per-year concentrator, expansion of hydrometallurgical refining capacity from 300,000 tonnes to 1 million tonnes per year, and supporting infrastructure such as a new tailings storage facility.Asian Metal Copyright8 billion (USD669 million).

    By the end of 2024, Yulong copper mine had 830 million tonnes of ore resources at 0.6% Cu on average, and produced 159,000 tonnes of mined copper that year.Asian Metal Copyright8 billion USD669 million.Asian Metal Copyright Once Phase III is completed, the annual mined copper output is expected to rise to 180,000-200,000 tonnes, further strengthening the company's production capacity.

    .Asian Metal Copyright Once Phase III is completed, the annual mined copper output is expected to rise to 180,000-200,000 tonnes, further strengthening the company's production capacityAsian Metal Copyright
    Copper Conc. 20%min Delivered China
    Unit:RMB/mt Cu
    Copper Conc. 20%min Delivered China RMB/mt Cu
    China copper concentrate producers' sales volume statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.