• Copper Conc. TC 25%min CIF Chinadown(-3)  07-04|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-04|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-50)  07-04|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-50)  07-04|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-100)  07-04|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(8)  07-04|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-04|Selenium Powder 99.9%min Delivered Indiaup(50)  07-04|Chrome Lump S.A. 38%min In port Chinadown(-1)  07-04|Silico-manganese 60/14 EXW Chinaup(100)  07-04|Silico-manganese 65/17 EXW Chinaup(100)  07-04|Rebar HRB400 20mm In warehouse Guangzhouup(50)  07-04|Flake Graphite +195 EXW Chinadown(-100)  07-04|Ferro-silicon 75%min In warehouse Rotterdamdown(-20)  07-04
  • Western Region Gold to acquire gold-copper polymetallic mine in Xinjiang

    2025-05-08 14:44:34   [Print]
    On May 7, Western Region Gold Co.Asian Metal Copyright3 tonnes of gold, presenting strong development prospects.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright entered into a cash purchase agreement with Xinjiang Nonferrous Metals Industry (Group) Co.Asian Metal Copyright3 tonnes of gold, presenting strong development prospects.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright to acquire 100% equity in Xinjiang Meisheng Mining Co.Asian Metal Copyright .Asian Metal Copyright, Ltd.Asian Metal Copyright67 million tonnes, containing 78.Asian Metal Copyrightthrough a combination of internal funds and loans.Asian Metal Copyright67 million tonnes, containing 78.Asian Metal Copyright The transaction price has yet to be determined.Asian Metal Copyright2 million tonnes of ore, amounting to 3.Asian Metal Copyright Upon completion of the deal, Xinjiang Meisheng will become a wholly-owned subsidiary of Western Region Gold.

    Xinjiang Meisheng owns the Kateba'asu Gold-Copper Polymetallic Project in Xinyuan County. Since its acquisition by Xinjiang Nonferrous Metals, Xinjiang Meisheng has not yet commenced production or business operations.Asian Metal Copyrightthrough a combination of internal funds and loans.Asian Metal Copyright The Kateba'asu Gold-Copper Mine has proven ore resources of 25.Asian Metal Copyright Since its acquisition by Xinjiang Nonferrous Metals, Xinjiang Meisheng has not yet commenced production or business operations.Asian Metal Copyright67 million tonnes, containing 78.Asian Metal Copyrightthrough a combination of internal funds and loans.Asian Metal Copyright7 tonnes of gold.Asian Metal Copyright entered into a cash purchase agreement with Xinjiang Nonferrous Metals Industry Group Co.Asian Metal Copyright Once the project is fully developed and operational, it is expected to achieve a production capacity of 4,000 tonnes per day, with an annual output of 1.Asian Metal Copyright Once the project is fully developed and operational, it is expected to achieve a production capacity of 4,000 tonnes per day, with an annual output of 1.Asian Metal Copyright2 million tonnes of ore, amounting to 3.Asian Metal Copyright Since its acquisition by Xinjiang Nonferrous Metals, Xinjiang Meisheng has not yet commenced production or business operations.Asian Metal Copyright3 tonnes of gold, presenting strong development prospects.

    .Asian Metal Copyright67 million tonnes, containing 78Asian Metal Copyright
    Copper Rod TC Ф8mm EXW China
    Unit:RMB/mt
    Copper Rod TC Ф8mm EXW China RMB/mt
    China copper concentrate producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.