• Spodumene Li2O 3%min In port Chinaup(25)  08-08|Terbium Oxide 99.99%min In Warehouse Rotterdamup(100)  08-08|Ferro-silicon 75%min In warehouse Pittsburghup(0.03)  08-08|Spodumene Li2O 5%min In port Chinaup(30)  08-08|Lithium Manganate Mn 58% Delivered Chinaup(800)  08-08|Rhenium APR 99.99%min EXW Chinaup(300)  08-08|Lithium Carbonate 99.2%min Delivered Chinaup(2000)  08-08|Lithium Metal 99%min Delivered Chinaup(15000)  08-08|Selenium Powder 99.9%min Delivered Chinaup(5)  08-08|Lithium Carbonate 99.5%min Delivered Chinaup(2000)  08-08|Yttrium Oxide 99.999%min In warehouse Rotterdamup(1.5)  08-08|Yttrium Oxide 99.999%min FOB Chinaup(0.3)  08-08|Ferro-tungsten 75%min FOB Chinaup(1.5)  08-08|Spodumene Li2O 6%min CIF Chinaup(20)  08-08
  • Xinjiang Xipengduo to build 200ktpa prebaked anode project

    2024-12-25 15:36:16   [Print]
    Xinjiang Xipengduo New Materials Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright plans to invest RMB200 million (USD27.Asian Metal Copyright, Ltd.Asian Metal Copyright42 million) to build an anode carbon block project in Changji Prefecture, with an annual production capacity of 200,000t of prebaked anode for aluminum smelting, and construction of the project is expected to take two years, according to an EIA document reviewed by the Ecological Environment Bureau of Changji Prefecture.

    .Asian Metal Copyright Asian Metal Copyright
    Prebaked Anode S 3%max EXW China
    Unit:RMB/mt
    Prebaked Anode S 3%max EXW China RMB/mt
    China commercial prebaked anode producers' sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.