• Lanthanum Metal 99%min FOB Chinaup(0.1)  08-29|Ferro-tungsten 70%min EXW Chinaup(10000)  08-29|Sodium Tungstate WO3 68%min EXW Chinaup(7000)  08-29|Tungsten Carbide 99.8%min 2.5-7.0μm EXW Chinaup(15)  08-29|Tungsten APT 88.5%min EXW Chinaup(10000)  08-29|Zirconium Silicate Zr(Hf)O2 60%min EXW Chinaup(300)  08-29|Tungsten Ore WO3 55%min EXW Chinaup(7000)  08-29|Neodymium Metal 99%min FOB Chinaup(3)  08-29|Praseodymium Oxide 99.5%min FOB Chinaup(2500)  08-29|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinaup(15)  08-29|Tungsten Ore WO3 65%min EXW Chinaup(7000)  08-29|Tungsten Bar W-4 99.9%min EXW Chinaup(15)  08-29|Ferro-tungsten 75%min EXW Chinaup(10000)  08-29|Spodumene Li2O 3%min In port Chinadown(-25)  08-29
  • Kings Resources to build fluorspar dressing plant in Mongolia

    2024-12-11 14:15:28   [Print]
    China Kings Resources Group Co.Asian Metal Copyright announced that it plans to set up a wholly-owned subsidiary Lacwest FlLLC in Mongolia for developing a fluorspar beneficiation plant with ore dressing capacity of 1,500 tonnes per day, as the company seeks to further expand mineral processing capacity.Asian Metal Copyright, Ltd.Asian Metal Copyright The new plant has a designed ore dressing capacity of 1,500 tonnes per day and 450,000 tonnes per annum.Asian Metal Copyright announced that it plans to set up a wholly-owned subsidiary (Lacwest FlLLC) in Mongolia for developing a fluorspar beneficiation plant with ore dressing capacity of 1,500 tonnes per day, as the company seeks to further expand mineral processing capacity.

    Kings Resources plans to invest, through its holding subsidiary Zhejiang Huameng Holdings Co., Ltd, approximately RMB173 million (USD23.Asian Metal Copyright86 million in total to build the beneficiation plant in Dornogovi Province of Mongolia, and the construction is expected to take 24 months.Asian Metal Copyright86 million) in total to build the beneficiation plant in Dornogovi Province of Mongolia, and the construction is expected to take 24 months.Asian Metal CopyrightChina Kings Resources Group Co.Asian Metal Copyright The new plant has a designed ore dressing capacity of 1,500 tonnes per day and 450,000 tonnes per annum.Asian Metal Copyright86 million in total to build the beneficiation plant in Dornogovi Province of Mongolia, and the construction is expected to take 24 months.Asian Metal Copyright When fully operational, it will be able to produce 180,000 tonnes of fluorspar concentrate annually.

    .Asian Metal Copyright, LtdAsian Metal Copyright
    Calcium Granule Reductive 98%min FOB China
    Unit:USD/mt
    Calcium Granule Reductive 98%min FOB China USD/mt
    China reductive calcium clump producers' output statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.