• Antimony Trioxide 99.5%min In warehouse Rotterdamup(1.4)  04-30|Silicon Powder 99%min Delivered Chinadown(-300)  04-30|Spodumene Li2O 5%min In port Chinadown(-30)  04-30|LNCMO 523 PC Delivered Chinadown(-3)  04-30|Reduced Ilmenite TiO2 56%min EXW Chinadown(-100)  04-30|LNCMO 523 SC Delivered Chinadown(-3)  04-30|Silicon Metal 5-5-3 Ex-VAT FOB Chinadown(-30)  04-30|Ferro-titanium 70%min Delivered USdown(-0.2)  04-30|Silicon Metal 5-5-3 FOB Chinadown(-30)  04-30|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.2)  04-30|Yttrium Oxide 99.999%min EXW Chinadown(-1000)  04-30|HR Coil SS400 3.0mm In warehouse Kuala Lumpurup(50)  04-30|Molybdenum Scrap Wire 99.95%min Ex-VAT EXW Chinaup(6)  04-30|Sodium Tungstate WO3 68%min EXW Chinaup(3000)  04-30
  • Zijin Mining to develop Juno copper mine in Tibet

    2024-10-21 14:51:23   [Print]
    Zijin Mining has received board approval to launch the mining and dressing project at Juno copper mine in Tibet, for a total planned investment of around RMB8.Asian Metal CopyrightZijin Mining has received board approval to launch the mining and dressing project at Juno copper mine in Tibet, for a total planned investment of around RMB8.Asian Metal Copyright39 billion (USD1.Asian Metal Copyright So far, Zijin Mininghas obtained the mining permit, EIA approval and authority approval, which are necessary for developing the project.Asian Metal Copyright18 billion).

    The project will adopt open-pit mining method, with a mining and dressing capacity of 18 million tonnes per annum, and the main mineral products include copper concentrate (containing silver) and molybdenum concentrate, the company said in an announcement.

    With a service life of 26 years, the project is scheduled to become operational in late June 2026, and when reaching full capacity, it is expected to produce about 76,000 tonnes of copper, 19.7 tonnes of silver and 1,188 tonnes of molybdenum annually on average.Asian Metal Copyright .Asian Metal Copyright So far, Zijin Mining has obtained the mining permit, EIA approval and authority approval, which are necessary for developing the project.

    .Asian Metal Copyright With a service life of 26 years, the project is scheduled to become operational in late June 2026, and when reaching full capacity, it is expected to produce about 76,000 tonnes of copper, 19Asian Metal Copyright
    Copper Conc. TC 25%min CIF China
    Unit:USD/mt
    Copper Conc. TC 25%min CIF China USD/mt
    China copper concentrate producers' inventory to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.